Can I Turn My Double-Height Room Into an Extra Room in Dubai Hills?

Yes, with structural approval before works. The new slab uses independent columns or bolted steel beams, and it adds GFA.

The short answer

Yes, a double-height space in a Dubai Hills villa can be filled with a new slab, with structural approval before works. The new floor is carried by independent columns, or by bolted steel beams subject to Emaar and authority approval. It adds GFA, so Emaar charges on the added area, and it needs the Emaar NOC and a DDA permit. Double-height rooms are common in Dubai Hills, and this is often the first option owners ask about, since nothing changes outside.

AllowedWith structural approval
SupportColumns or steel beams
AddsGFA

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Outside: The elevation usually stays the same.
  • Windows: Tall windows may need a design solution at the new floor level.
  • Stairs: We check access to the new room.
  • Calculations: Stamped design for the new slab.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

Applied through the Emaar Community Portal.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Dubai Hills

🏘️

Emaar

Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.

What is an Emaar NOC? →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.

Is Dubai Hills under DDA? →
📐

Structural Solutions

Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.

Dubai Hills approval guide →

Why applications come back

  • Design does not follow Emaar’s rules
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Can I fill a double-height room?

Yes, with structural approval before works.

Does it add GFA?

Yes, and Emaar charges on the added area.

Steel or concrete?

Independent columns or bolted steel beams, subject to approval.

Do I need a DDA permit?

Yes, after the Emaar NOC.