Can I Make My DAMAC Hills 2 Villa Look Modern?
A new look outside, within the rules.
Often partly. Changes to the outside, such as cladding, larger windows, railings or a new entrance, are reviewed by DAMAC against the community look, and structural changes need stamped calculations and a DDA permit. Inside, a full modern renovation is usually easier. We check what is possible before you design.

Official sources: Dubai Development Authority (DDA)
What we check first
- Plot: Setbacks
- Home: Villa or townhouse
- Structure: Walls, slabs, foundations
- Area: Added floor area
- Look: DAMAC guidelines
- Route: DAMAC, then DDA
Documents you will need
- Villa or townhouse number in DAMAC Hills 2
- Title deed and owner ID
- Photos of the home and the area
- Plans from your handover documents, if you have them
Route
The approval route in DAMAC Hills 2
DAMAC first, then DDA. Villas and townhouses follow the same route.
| Step | Approval route | Guides |
|---|---|---|
| Early check Our engineers | Your idea, photos and plot; plans from your handover documents, or a survey. | — |
| Drawings Structural Solutions | Drawings and stamped structural calculations. | Structural calculations |
| DAMAC NOC DAMAC | Against the community guidelines. | How to apply |
| DDA permit Dubai Development Authority (DDA) | For structural works and added area. | DAMAC Hills 2 DDA permit |
| Works Your contractor | To the approved drawings. | — |
| Completion DAMAC and DDA | Inspections, DAMAC clearance and the DDA completion certificate. | Completion certificate |
How it works
How it works
1. Send us the idea
Villa number, photos and what you want.
2. Plans
Handover plans, or a survey.
3. Early check
Guidelines, plot and structure.
4. Drawings
Drawings and calculations.
5. DAMAC NOC
We apply for you.
6. DDA permit
Then works and completion.
Related DAMAC Hills 2 questions
What causes problems
- Starting works before the DAMAC NOC
- Structural works without the DDA permit
- Designing before checking the plot
Home in DAMAC Hills 2?
Check your idea first
Send us three things on WhatsApp:
- Villa or townhouse number
- Photos of the area
- What you want to do
We check DAMAC’s guidelines and the structure, then handle the DAMAC NOC and the DDA permit.
Questions
Questions
Can I change the facade?
Within DAMAC’s guidelines, with the NOC.
Do bigger windows need a permit?
Yes, if the wall is structural.
Is inside easier?
Usually, yes.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
