Can I Get Special Approval for a Disabled Family Member?

You can ask. wasl considers accessibility requests for medical needs, and each one is decided case by case. A clear medical letter and a design that keeps to the rules as far as possible help the request.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What to Prepare

A medical letter, the design and a short explanation of why the change is needed.

How It Works in Jumeirah Golf Estates

01

Photos, Plot Details and Your Idea

02

Check Against the JGE Guidelines

03

Sketch and Early Feedback

04

wasl Concept and Detailed Design Review

05

Trakhees Building Permit

06

Works, Inspection and Completion

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What Can Be Asked

Accessibility concessions for changes such as a lift, ramps or a ground-floor bedroom.

What JGE Owners Ask Us About

Lift

Ramp

Ground-Floor Bedroom

Accessible Bathroom

Wider Doors

Platform Lift

Can I Get Special Approval for a Disabled Family Member

StepWhoWhat happens
1You and our engineersYour idea, photos and plot details. We get the as-built plans from wasl and check them against the villa.
2wasl Urban Management (JGE NOC / DRC)Reviews the concept design, then the detailed design, against the JGE Building Guidelines. We apply for you.
3TrakheesBuilding permit for structural works.
4wasl and TrakheesInspections and completion.

The JGE Rules That Matter Here

  • Medical needs: owners can ask wasl for accessibility concessions; each request is decided case by case
  • Two design reviews: wasl reviews a concept design, then a detailed design, before the Trakhees permit
  • Lift inside the villa: a lift must stay inside the existing walls, with no part sticking out of the building

What to Send Us

  • Title deed and owner ID
  • Photos of the villa and the area to change
  • As-built floor plans (wasl provides these from the Trakhees completion records)
  • Your idea: a sketch is enough to start
  • Drawings at 1:100 or larger for the wasl review (we prepare these)
Villa modification in a Dubai community — Structural Solutions

JGE Guidelines

Checked first

wasl Review

Concept and detailed

Trakhees Permit

For structural works

Why JGE Owners Work With Us

We Know the JGE Rules

We check your idea against the JGE Building Guidelines before you spend money on full drawings.

wasl and Trakhees Handled

We prepare the drawings and handle the wasl Urban Management review and the Trakhees permit.

Engineers In-House

Structural checks, lift openings, mezzanines and extensions designed and stamped by our engineers.

Tell Us What You Want to Change

Send us photos, your plot details and your idea. We will tell you what is possible in JGE and handle the approvals.

Can I Get Special Approval for a Disabled Family Member? FAQs

Can wasl make an exception for medical needs?

You can ask; it is decided case by case.

Who approves changes to my JGE villa?

wasl Urban Management (the JGE NOC / DRC team) reviews the design, then Trakhees issues the building permit.

Do I need full drawings to ask if my idea is possible?

No. A sketch and photos are often enough for an early indication before full drawings.

What rules does wasl check?

The JGE Building Guidelines: floor area, plot coverage, setbacks, height, building envelope and style.

Can you handle everything for me?

Yes. We check your idea, prepare drawings and calculations, and handle the wasl review and the Trakhees permit.