Restaurants · Mall of the Emirates · Updated November 2026

Can I Extend My Restaurant in Mall of the Emirates?

Often yes, with approval. Mall of the Emirates is in Al Barsha, with restaurants on the main levels and around the ski slope. In Mall of the Emirates the route is the mall, then Dubai Municipality, then Dubai Municipality Food Safety and DCD. Structural works such as decks, terraces, shades or a mezzanine need stamped calculations.

Extending a restaurant in Mall of the Emirates means more seats, a terrace, a bigger kitchen or more space. Seating outside your unit in Mall of the Emirates is approved by the mall. Food Safety re-approves the layout for any change, and DCD approves every restaurant proposal.

1. MallNOC or approval first
2. Dubai MunicipalityPermit for structural works
3. Food Safety and DCDLayout re-approval and fire safety

By change

What can you add in Mall of the Emirates?

A general guide; our engineers confirm your unit.

ChangeApprovals
More seats insideFood Safety re-approval and DCD
Mall corridor seatingMall approval
Unit extensionMall approval, then Dubai Municipality
Bigger kitchenFood Safety re-approval, DCD; gas works by a DCD-approved contractor

Official sites: Dubai Municipality | Dubai Civil Defence | DDA

What you need to know

  • Mall first: Seating outside your unit in Mall of the Emirates is approved by the mall.
  • Authority: Dubai Municipality issues the permit for structural works.
  • Food Safety approves the food layout, and re-approves it for any change.
  • DCD approves every restaurant proposal.

Documents you will need

  • Trade licence
  • Tenancy contract or Ejari
  • Currently approved food layout (for an existing restaurant)
  • Photos of the unit

How it works

How we handle it

1. Unit check

Lease, approved layout and the space you want.

2. Route

The mall first.

3. Drawings

Layout and stamped calculations.

4. Permit

Dubai Municipality permit for structural works.

5. Food Safety and DCD

Re-approval and DCD.

6. Inspection

Before the new area opens.

Already done

Works already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Questions owners ask

Can I extend my restaurant in Mall of the Emirates?

Often yes, with approval: the mall, then Dubai Municipality, then Dubai Municipality Food Safety and DCD.

Who controls the space outside my unit?

Seating outside your unit in Mall of the Emirates is approved by the mall.

Which authority after the mall in Mall of the Emirates?

Dubai Municipality for structural works, plus Food Safety and DCD.

Do I need Food Safety approval again?

Yes. Any change to seats, layout or kitchen needs Dubai Municipality Food Safety re-approval.

Who can help?

We prepare the drawings and calculations and handle every approval in Mall of the Emirates. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading