DAMAC Lagoons (formerly Akoya Oxygen) · DAMAC · DDA

Can I Convert My Garage Into a Room in DAMAC Lagoons?

Your question about garage conversion.

Possibly, with the DAMAC NOC and a DDA permit. DAMAC reviews the front elevation and parking, and the new room needs light, ventilation and a structural check of the opening. We confirm what your villa or townhouse allows.

What we check first

  • Plot: Setbacks
  • Home: Villa or townhouse
  • Structure: Walls, slabs, foundations
  • Area: Added floor area
  • Look: DAMAC guidelines
  • Route: DAMAC, then DDA

Documents you will need

  • Villa or townhouse number in DAMAC Lagoons
  • Title deed and owner ID
  • Photos of the home and the area
  • Plans from your handover documents, if you have them

Route

The approval route in DAMAC Lagoons

DAMAC first, then DDA. Villas and townhouses follow the same route.

StepApproval routeGuides
Early check
Our engineers
Your idea, photos and plot; plans from your handover documents, or a survey.—
Drawings
Structural Solutions
Drawings and stamped structural calculations.Structural calculations
DAMAC NOC
DAMAC
Against the community guidelines.How to apply
DDA permit
Dubai Development Authority (DDA)
For structural works and added area.DAMAC Lagoons DDA permit
Works
Your contractor
To the approved drawings.—
Completion
DAMAC and DDA
Inspections, DAMAC clearance and the DDA completion certificate.Completion certificate

How it works

How it works

1. Send us the idea

Villa number, photos and what you want.

2. Plans

Handover plans, or a survey.

3. Early check

Guidelines, plot and structure.

4. Drawings

Drawings and calculations.

5. DAMAC NOC

We apply for you.

6. DDA permit

Then works and completion.

What causes problems

  • Starting works before the DAMAC NOC
  • Structural works without the DDA permit
  • Designing before checking the plot

Home in DAMAC Lagoons?

Check your idea first

Send us three things on WhatsApp:

  1. Villa or townhouse number
  2. Photos of the area
  3. What you want to do

We check DAMAC’s guidelines and the structure, then handle the DAMAC NOC and the DDA permit.

Questions

Questions

Do I need approval?

Yes, DAMAC then DDA.

What about the garage door?

The new front is reviewed by DAMAC.

What if it was already converted?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading