Structural Calculations · Consultant Stamp

Can an outside engineer stamp my contractor's drawings?

Yes. Structural Solutions reviews your contractor's drawings and calculations, requests any changes, and stamps them as consultant.

The short answer

Yes. Structural Solutions works with fit-out and building contractors as their consultant: we review the drawings and calculations, request any corrections, and stamp them once they meet the requirements. We then submit them to the developer, the mall, the authority or DCD. The contractor keeps the build, and we take responsibility for the engineering we stamp.

We reviewDrawings and calculations
We stampAs consultant
We submitDeveloper, mall, authority, DCD

What you need to know

  • Review first: We only stamp what meets the requirements.
  • Corrections: We tell you what to change.
  • Submission: We can also handle the approvals.
  • Contractor: Keeps the build.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Design brief
You and us
The size, use and loads of the structure.—
Calculations
Structural Solutions
Stamped structural calculations to the codes used in Dubai.Structural calculations
Drawings
Structural Solutions
Structural drawings that match the calculations.—
Approvals
Developer and authority
Submitted with the NOC and the building permit.Approvals
Inspection
Authority
Inspection and completion.Sign-off

Questions

Related questions

Will you stamp drawings without checking them?

No. We review them first.

Can you prepare the drawings instead?

Yes.

Do you work with many contractors?

Yes, for contractors, tenants and brands.

Can the contractor stamp them?

A consultant stamp is needed where the developer, mall or authority asks for one.

Related guides

Keep reading