Architect of Record for Fit-Out Projects in Dubai

Offices, shops, clinics and restaurants inside existing buildings need the landlord NOC, the fit-out permit and Civil Defence approval. We act as Architect of Record for the fit-out: we sign the layout, structure and MEP and take it through each step.

A fit-out in Dubai usually goes: building or landlord NOC, then the fit-out permit from the area authority, then Dubai Civil Defence for fire safety, then the inspections. We act as Architect of Record for fit-out contractors, designers and tenants and sign the whole fit-out package.

FirstBuilding or landlord NOC
ThenFit-out permit and DCD
We signLayout, structure, MEP

Route

The fit-out approval route

StepWho
Building or landlord NOCBuilding management, landlord or mall
Fit-out permitDM, DDA, Trakhees, DMCC or DSO Authority
Fire safety drawingsDubai Civil Defence; see fire drawings for a fit-out
Food layout, if anyDM Food Safety; see food safety
InspectionsAuthority and DCD, then handover

By type

Fit-out types

Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence

What you need to know

  • Landlord NOC comes before the permit.
  • Civil Defence applies to almost every fit-out.
  • Partitions, ceilings and MEP are all part of the package.
  • Heavy items may need a floor load check.

Documents you will need

  • Tenancy contract
  • Building or mall fit-out guide
  • Base build drawings, if available
  • Fit-out design

How it works

How we run a fit-out as Architect of Record

1. Design

From your designer.

2. NOC

Landlord or building.

3. Package

Layout, MEP, fire, structure.

4. Permit

Fit-out permit.

5. DCD

Fire approval.

6. Handover

Inspections.

Questions

Fit-out AoR questions

Who submits a fit-out in Dubai?

An approved consultant. As Architect of Record we submit the fit-out package.

Can the fit-out contractor submit?

The contractor builds; the submission goes through the consultant.

Is Civil Defence approval needed for a fit-out?

In almost every case, yes.

Do you work with fit-out contractors?

Yes, often. The contractor keeps the build; we handle the package and the approvals.

Who can help?

Structural Solutions acts as Architect of Record: we sign the whole package, architecture, structure and MEP, submit it as the approved consultant and follow the comments until the approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.