How We Prepare a Structural Report for Dubai Municipality in 3 Days

How We Prepare a Structural Report for Dubai Municipality in 3 Days

🏗️ Introduction: Why You Need a Structural Report in Dubai

In Dubai, almost any structural modification—whether it’s removing a wall, building a pergola, modifying a slab, or even installing heavy equipment—requires a structural report submitted to Dubai Municipality (DM) or other authorities like DDA or Trakhees.

A structural report must:

  • Confirm that proposed works are structurally safe
  • Be prepared by a qualified structural engineer
  • Often include calculation sheets, load verifications, and as-built overlays

But here’s the good news:
You don’t need a big-name consultancy to get it done.

At Structural Solutions, we offer freelance structural reports that are accepted by Dubai Municipality—and we can prepare most of them within 3 working days.

What Is a Structural Report?

A structural report is an engineering document that:

  • Assesses existing structural conditions (slabs, beams, foundations, etc.)
  • Analyzes the impact of proposed modifications
  • Includes load calculations and compliance checks
  • Offers recommendations for reinforcements or execution methods
  • May include drawings, photos, and authority formats

When Is a Structural Report Required?

You’ll typically need a DM-approved structural report when:

SituationStructural Report Needed?
Wall removal (apartment or villa)✅ Yes
Adding pergola, canopy, or shade✅ Yes
Installing water tank or chiller on slab✅ Yes
Modifying staircase or slab✅ Yes
Building or removing columns/beams✅ Yes
Applying for retrospective NOC✅ Yes
Moving heavy machinery✅ Yes

💡 Even if no permit was taken before, you’ll need a structural report to apply for a retrospective approval.

How We Prepare a Structural Report for Dubai Municipality in 3 Days

What’s Included in Our Structural Reports?

At Structural Solutions, each report is tailored to your scope. But typically, it includes:

1. Cover Letter & Engineer’s Statement

  • Outlines the project scope
  • Confirms compliance with ACI 318, ASCE 7, and Dubai codes
  • Signed and stamped by a qualified structural engineer

2. Structural Analysis & Calculations

  • Load assessment (dead, live, imposed)
  • Beam, slab, or footing checks
  • Wall removal reinforcement, if required
  • Dynamic loads (e.g., chiller equipment, mobile crane)
  • Wind or seismic check (if applicable)

3. As-Built Review (if original drawings unavailable)

  • Site-verified dimensions
  • Engineering assumptions with safety margins
  • Non-destructive testing notes (if available)

4. Drawings & Markups

  • Before & after layouts
  • Wall removal overlays
  • Pergola/canopy positions
  • Load zones on slabs

5. Photos & Observations

  • Annotated photos of modification zones
  • Site condition notes
  • Highlight of any structural risk zones

6. Conclusion & Recommendations

  • Is the modification structurally safe?
  • What support (if any) is needed?
  • Can DM approval proceed?

Our 3-Day Turnaround Process – Step by Step

Day 1 – Site Info Collection

  • You send photos, dimensions, scope (or we visit)
  • If original drawings exist, send DWGs or PDFs

Day 2 – Engineering Analysis

  • Structural engineer calculates all required load checks
  • Draft report is prepared with overlays and assumptions

Day 3 – Finalization & Stamp

  • Final review, PDF formatting
  • Stamped report ready for submission
  • Optional: AutoCAD files or DM portal assistance

Real Case: Wall Removal in a JVC Apartment

Client: Tenant removed a wall between kitchen and living room
Issue: DM asked for structural clearance before retrospective NOC
Our Scope:

  • Reviewed site photos and existing DWG
  • Confirmed the wall was NOT load-bearing
  • Prepared and stamped report in 2.5 working days
  • Client uploaded report and got approval in under a week
How We Prepare a Structural Report for Dubai Municipality in 3 Days

Authorities We Support

AuthorityAccepted Report?Notes
Dubai Municipality (DM)✅ YesFor villas, apartments, structural changes
Dubai Development Authority (DDA)✅ YesFor fit-outs and approvals in Business Bay, Downtown, etc.
Trakhees (JAFZA, Palm Jebel Ali, Nakheel Projects)✅ YesRequired for structural NOC or load approvals
Nakheel, EMAAR, DAMAC✅ YesUsed for community NOCs and layout verifications

Pricing & Timelines

Report TypeDelivery TimeStarting Price (AED)
Simple Wall Removal2–3 days950–1,500
Pergola / Shade Structure3 days1,500–2,000
Equipment Load Check (chillers, tanks)3–4 days1,800–2,500
Retrospective NOC with Full Layout3–5 days2,000–3,500

🕒 Express service available for urgent cases
🛠️ Need site visit or CAD drawings? We can include that as well

Frequently Asked Questions

Do I need an engineer’s stamp?

✅ Yes. All reports must be signed by a qualified structural engineer licensed in the UAE.

Can I get a report without drawings?

✅ Yes. We use site measurements and assumptions. In some cases, slab scanning may help.

What if I already modified something?

✅ No problem. We prepare reports for retrospective approvals and help with the submission process.

Do I need a full consultant for this?

❌ Not necessarily. Freelance engineers like us can support with fast, compliant documentation—especially for minor structural works.

Conclusion: Get Your DM Structural Report in 3 Days

If you’re renovating your home, making structural changes, or facing authority issues—don’t wait weeks for a report. At Structural Solutions, we deliver fast, engineer-stamped structural reports that are ready for submission and tailored for approval.

From villas to apartments, from pergolas to slab cuts—we’ve got your structure (and your paperwork) covered.

📩 Ready to start your structural report?
🌐 www.structuralsolutions.ae
📧 info@structuralsolutions.ae
📞 Call or WhatsApp: 055 339 4451

Structural Solutions – Dubai’s Go-To Freelance Engineers for Fast Structural Approvals.