loader image
Dubai Villa Modifications Get Approved Fast Permit Without Consultant

Permit Without Consultant? We’ll Get DM/DDA Approval

Introduction

Permit Without Consultant: In Dubai, getting a permit for structural or architectural works often means dealing with licensed consultants, long timelines, and expensive contracts.
But what if you already have a license — as a contractor, architect, or design firm — and just need help with the technical side of the submission?

At Structural Solutions, we offer a smarter alternative.

We provide:

  • Full structural calculations
  • Authority-compliant drawing preparation
  • And submission support — all done under your company’s trade license

This means you stay in control of the project while we do the heavy lifting behind the scenes — no need to hire an external consultancy or pay markup fees.

Whether you need approval from Dubai Municipality (DM), Dubai Development Authority (DDA), or Trakhees, we’ll help you get it — quickly, accurately, and under your name.

Who This Service Is For

Our “You Submit – We Support” model is designed for:

  • 🏗️ Contracting companies who have the authority to submit but lack in-house engineers
  • 🏢 Fit-out and interior firms modifying layouts or walls
  • 🧱 Architects and designers needing help with structure or code compliance
  • 🛠️ MEP firms needing stamped slab or equipment load checks
  • 🏘️ Villa or apartment project managers with limited technical staff

If you have the trade license, we’ll prepare everything you need to submit directly on the official portal — DM, DDA, or Trakhees.

Why Avoid Hiring a Full Consultant?

Traditional consultants often:

  • Delay submissions due to internal workflows
  • Refuse small jobs like pergolas or partition walls
  • Charge minimum fees for every scope — even minor
  • Insist on full architectural + structural packages (when you only need structural)

Our model offers you:
✅ No consultant dependency
✅ No markups
✅ No delays
✅ Full technical backing, reports, and stamped calculations

We empower your team to submit confidently — with the same quality as a licensed consultant, but under your own name.

DDA & DCM Approval Dubai Site Plan Guide Permit Without Consultant

What We Provide (Scope of Services)

We specialize in back-end technical support to help your in-house team or your registered engineer submit with confidence.

Here’s what we provide:

Structural Calculations

  • Slab load checks (water tanks, platforms, heavy machines)
  • Wall removal analysis and beam sizing
  • Wind load verification for pergolas and canopies
  • Structural member sizing for steel/aluminum
  • Outrigger load & mobile crane pressure analysis

Drawing Preparation & Markups

  • CAD drawings for structural layouts, revisions, or concept submission
  • DWG + PDF outputs, coordinated with architectural intent
  • Highlighted revisions for DM, DDA, or Trakhees clarity
  • As-built updates for submission or regularization

Stamped Reports & Compliance Docs

  • Structural engineer stamp (UAE-registered)
  • Safety factors and code references (ACI, ASCE, BS, DM Guidelines)
  • Load calculation reports (English/Arabic if required)
  • Calculation summary + drawing overlays (PDF format)

Submission Guidance

  • Checklist of submission requirements per authority
  • Highlighting what’s needed from your side (drawings, license, etc.)
  • Notes for DM online portal, DDA e-permit, Trakhees EHS platform

Authorities We Support

Dubai Municipality (DM)

Typical permits we support:

  • Wall removal (load-bearing/non-load)
  • Slab load check
  • Steel pergola
  • Lightweight extensions
  • Partition modifications

Dubai Development Authority (DDA)

We help with:

  • Fit-out structural checks
  • Raised floor or equipment supports
  • Wall modifications in towers/apartments
  • Layout changes impacting structure

Trakhees (JAFZA, Nakheel, Palm Jebel Ali)

Common approvals:

  • Steel platforms and racks
  • Mobile crane slab verifications
  • Equipment installation loads
  • Modifications inside industrial/warehouse buildings

Real-World Examples

Case 1: Wall Removal by Contractor in DM

  • Client: Fit-out contractor
  • Scope: Load-bearing wall in residential unit
  • Solution: We provided beam design, load checks, and stamped report
  • Submitted under contractor’s license via DM portal
    ➡️ Permit approved in 4 days

Case 2: Pergola Approval by Maintenance Company (Nakheel)

  • Client: Landscaping contractor
  • Scope: Aluminum pergola on rear garden
  • Solution: Wind load analysis + base plate design
  • Client submitted under own license to Nakheel
    ➡️ NOC received in 6 working days

Case 3: Steel Platform in Warehouse (Trakhees)

  • Client: MEP firm
  • Scope: Raised steel support for chiller tanks
  • Solution: Load analysis + base slab check + stamped report
  • Submission handled in-house by their team
    ➡️ Trakhees accepted with no revisions

Key Benefits

BenefitDescription
✅ Save TimeNo waiting on external consultants to prioritize your job
✅ Lower CostPay only for what you need — no full consultancy fees
✅ Total ControlYou or your engineer handles submission — we prep everything
✅ Fast TurnaroundMost scopes delivered in 2–4 working days
✅ ScalablePerfect for one-off projects or long-term contracting needs
Engineering Consultants Dubai structural consultants in Dubai Permit Without Consultant

How It Works – Step-by-Step

  1. Send Us Your Scope
    You share: floor plan, crane info, site photo, or drawing PDF
  2. We Propose Scope + Quote
    You approve our deliverables (calc, drawings, report, etc.)
  3. We Deliver Complete Package
    Includes stamped reports, drawings, and submission guidance
  4. You Submit to the Authority
    Under your company license — no third party needed
  5. We Support Revisions If Required
    In case of RFI or authority comments, we respond fast

FAQs

Q: Can I submit to DM or DDA without a consultant?

✅ Yes, if you have a valid contracting or engineering trade license and a qualified engineer listed on it.

Q: Will the documents be stamped?

✅ Yes — all reports and calculations are signed/stamped by our UAE-registered structural engineer.

Q: What if I don’t have the original structural drawings?

✅ We can work with site photos, as-built assumptions, or conduct a quick site inspection.

Q: What if the authority asks for a full consultant submission?

✅ In such rare cases, we can escalate to our licensed partner Nirvana AEC and complete the process officially.

What Makes Structural Solutions Different?

🕒 Speed
We deliver calculations in 2–3 working days on average.
No consultant delay.

📋 Authority-Ready Reports
We know what each Dubai authority looks for — no trial & error.

🎯 Flexibility
You stay in charge of the submission, fees, and relationship.
We just provide expert support.

🛠️ Built for Contractors and Firms
Not homeowners — this service is optimized for licensed professionals who need calculation support without consultancy bloat.

Conclusion

Dubai’s approval system can feel like it’s built for consultants — but it doesn’t have to be.

If you’ve got the trade license, Structural Solutions will help you handle everything else:

  • Structural calculations
  • Stamped reports
  • Drawing prep
  • Submission advice

All while keeping your name, your license, and your client.

📩 Want to get started?
Share your project scope and we’ll send a quote within 24 hours.

🌐 www.structuralsolutions.ae
📧 info@structuralsolutions.ae
📞 Call or WhatsApp us today

No consultant? No problem.
You submit. We do the engineering.

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Most Voted
Newest Oldest
Inline Feedbacks
View all comments