How to Apply on Build in Dubai
Build in Dubai is where Dubai Municipality permits are applied for. In practice the consultant makes the application, not the owner.
Build in Dubai is the Dubai Municipality platform for building permits and related services, such as design concept approval, site preparation permits, building permits, changes of consultant or contractor and completion certificates. Applications for building works are made by the appointed consultant, which logs in, uploads the drawings and documents, pays the fees and answers the comments from Dubai Municipality and the other authorities. As the owner, you appoint the consultant and sign the documents they ask for. Structural Solutions makes the applications on Build in Dubai for our clients and keeps them updated at each stage.
Services
What is applied for on Build in Dubai
| Service | Guide |
|---|---|
| Design concept (initial) approval | design concept approval |
| Site preparation permit | site preparation permit |
| Building permit | the building permit |
| Exception request | building permit exception |
| Change of consultant or contractor | change after the permit |
| Completion certificate | villa completion certificate |
Steps
How an application runs
| Step | Who |
|---|---|
| Appoint the consultant | Owner |
| Prepare drawings and documents | Consultant |
| Submit on Build in Dubai | Consultant |
| Review and comments | Dubai Municipality and service authorities |
| Pay fees and receive the permit | Consultant, with the owner |
Official sites: Dubai Municipality
What you need to know
- Build in Dubai is the DM platform.
- Consultant applies.
- Owner appoints and signs.
- Comments answered by us.
Documents you will need
- Owner ID
- Plot ownership document
- Affection plan
- Existing permits, if any
How it works
How to Apply on Build in Dubai: how it works
1. Appoint
Your consultant.
2. Prepare
Drawings and documents.
3. Submit
Build in Dubai.
4. Comments
Answered.
5. Permit
Issued.
Questions
How to Apply on Build in Dubai: questions
Can I apply myself as the owner?
For building works the application is made by the appointed consultant. We handle it for you.
Is Build in Dubai the same as the old BPS system?
It is the current Dubai Municipality platform for building permit services. See how DM submissions work.
Can I track my application?
Yes, through your consultant. We update you at each stage.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions handles Dubai Municipality design, permits, supervision and completion for villas and buildings as your consultant. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
