MRI Room Floor Load and Structural Check in Dubai
An MRI magnet is one of the heaviest single items brought into a building, and it has to get in through doors, corridors and lifts first.
Before an MRI or CT scanner is installed in Dubai, the floor that carries it, and every floor and lift on the route into the building, is checked. We take the equipment data from the supplier and the existing structural drawings, analyse the slab for the scanner and its supports, and check the delivery route. The result is a full structural report: either the floor can carry it as it is, or we design a spreader plate or strengthening. The report supports the fit-out approval and the landlord’s NOC. Magnetic and radiation shielding are designed by specialists and coordinated with our design.
What we check
MRI and scanner structural checks
| Check | What we look at |
|---|---|
| Slab capacity | Scanner weight and support points |
| Delivery route | Floors, doors and lifts on the way in |
| Vibration | Sources near the scanner room |
| Spreader or strengthening | Designed if the slab needs help |
| Shielding weight | Added load from the specialist design |
Related
Related structural guides
| Topic | Guide |
|---|---|
| Diagnostic centre approval | diagnostic centre approval |
| Change of use assessment | the structural assessment |
| Gym and heavy equipment | equipment floor load |
Official sites: Dubai Municipality | DDA
What you need to know
- Equipment data from the supplier.
- Existing drawings analysed.
- Route checked.
- Report for approval.
Documents you will need
- Scanner equipment data
- Existing structural drawings
- Floor plan with the scanner room
- Delivery route plan
How it works
MRI floor check, step by step
1. Data
Equipment.
2. Drawings
Existing.
3. Analyse
Slab.
4. Route
Check.
5. Design
Spreader if needed.
6. Report
For approval.
Questions
MRI floor load: questions
Can my floor carry an MRI machine?
We check it from the equipment data and the existing structural drawings, and design a spreader or strengthening if needed.
Do you check the delivery route?
Yes, floors, doors and lifts on the way in.
Who designs the MRI shielding?
A specialist; we include its weight in our check.
What if there are no structural drawings?
We look at how the information can be obtained or surveyed. Contact us.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions checks floors for MRI and CT scanners in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.