Change of use · Feasibility · Updated November 2026

Change of Use Feasibility Study in Dubai

The most expensive change of use is the one found impossible after the lease is signed.

A change of use feasibility study checks, before you sign a lease or buy, whether a unit can be approved for the use you want. We look at the building rules and the landlord or building management position, the authority for the area, the structure (floor loads and openings for the new use), the MEP needs (exhaust, drainage, power), and what Civil Defence (DCD) will require for exits and fire safety. You get a clear answer on whether it is possible, what has to change and which approvals are needed. If it works, we continue to the drawings and approvals.

WhenBefore the lease
ChecksRules, structure, MEP, DCD
ResultPossible or not

What we check

What a feasibility study covers

CheckWhat we look atGuide
Building rulesDoes the landlord allow the use?the fit-out NOC
AuthorityWho approves in that areachange of use approval in Dubai
StructureFloor loads and openingsthe structural assessment
MEPExhaust, drainage, powerchange of use MEP design
Fire safetyExits and fire ratingfire exit changes

Official sites: Dubai Municipality | DDA | Dubai Civil Defence

What you need to know

  • Check before signing.
  • Structure and MEP.
  • DCD needs.
  • Clear answer.

Documents you will need

  • Tenancy contract or title deed
  • Landlord or building management NOC
  • Existing approved drawings, if any
  • Trade licence or initial approval for the new activity

How it works

Change of Use Feasibility Study in Dubai, step by step

1. Check

Is it possible?

2. NOC

Landlord.

3. Design

Drawings, MEP.

4. Structure

Load check.

5. Permits

Authority, DCD.

6. Complete

Inspection.

Questions

Change of Use Feasibility Study in Dubai: questions

What is a change of use feasibility study?

A check of whether a unit can be approved for a new use before you commit to it.

Do you visit the unit?

Yes, we survey it and review any existing drawings.

What if it is not possible?

We tell you why and whether another unit or a different use would work.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions checks change of use feasibility for units and villas in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.