Change of use · Fire exits · Updated November 2026

Fire Rating and Exit Changes for a New Occupancy

A unit designed for twenty office staff may not have the exits for eighty diners or a busy gym class.

When a unit changes use in Dubai, the number of people it can hold and the hazards inside it change, so the exits and fire rating are checked again. More people may need more exits, wider exits or shorter travel distances; some uses, such as kitchens, storage or clinics, need fire-rated separation from neighbours or between rooms. A new exit can mean a new opening in a wall or slab, which we check structurally. Civil Defence (DCD) approves the result. We work out the occupancy, design the exits and fire rating and submit them with the change of use.

CheckedOccupancy and exits
Some usesFire-rated separation
ApprovesDCD

What changes

Exit and fire rating items for a new use

ItemWhat we check
OccupancyHow many people the new use brings
Number of exitsWhether one exit is still enough
Exit width and travel distanceAgainst the new occupancy
Fire-rated walls and doorsKitchens, storage, plant and some clinic rooms
New exit openingStructural check: the structural assessment

Official sites: Dubai Municipality | DDA | Dubai Civil Defence

What you need to know

  • Occupancy recalculated.
  • Exits checked again.
  • Fire rating for some uses.
  • DCD approves.

Documents you will need

  • Tenancy contract or title deed
  • Landlord or building management NOC
  • Existing approved drawings, if any
  • Trade licence or initial approval for the new activity

How it works

Fire Rating and Exit Changes for a New Occupancy, step by step

1. Check

Is it possible?

2. NOC

Landlord.

3. Design

Drawings, MEP.

4. Structure

Load check.

5. Permits

Authority, DCD.

6. Complete

Inspection.

Questions

Fire Rating and Exit Changes for a New Occupancy: questions

Do I need a second exit after a change of use?

It depends on the new occupancy and the travel distance. We calculate it.

Can a new exit be cut into the wall?

Often, after building management agrees and we check the structure.

Who approves the exits?

Civil Defence (DCD). See change of use and DCD.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions designs exits and fire rating for change of use in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading