Shoreline AC and MEP Modification Approval
New AC units, moved ducts, extra sockets or a new extract: MEP changes in Shoreline go through Nakheel and Trakhees.
Changes to the air conditioning, ducting, electrical layout, plumbing or extract in a Shoreline apartment need MEP drawings, the Nakheel NOC and a Trakhees permit. Where the change affects fire alarms, sprinklers or smoke control, Civil Defence approval is added. The building cooling system and shared services set limits on what can change, so we check them at the start.
Changes
Common MEP changes
| Change | Approval |
|---|---|
| Move or add AC units or ducts | Nakheel NOC, Trakhees permit |
| New electrical layout | MEP drawings, Trakhees |
| Plumbing or drainage changes | Trakhees permit |
| Kitchen extract | Trakhees permit |
| Sprinkler or fire alarm changes | Civil Defence approval |
| False ceiling with new lights | MEP drawings |
Official sites: Trakhees | Dubai Civil Defence
What you need to know
- MEP drawings needed.
- Nakheel, then Trakhees.
- Civil Defence for fire systems.
- Shared systems set limits.
Documents you will need
- Current layout
- Change list
- Title deed
- Contractor details
How it works
Changing MEP
1. Check
Shared systems.
2. Design
MEP drawings.
3. Approve
Nakheel, Trakhees.
4. Fire
DCD if needed.
Already done
Works already done without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
MEP changes: questions
Can I move my AC unit?
Yes, with MEP drawings, the Nakheel NOC and a Trakhees permit.
Do sprinkler changes need Civil Defence?
Yes.
Can I add a kitchen extract?
Usually, subject to the building systems and a Trakhees permit.
Who prepares the MEP drawings?
We do, with the approvals.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise. Nakheel and Trakhees fees are separate.
Who can help?
Structural Solutions prepares MEP drawings and approvals for Shoreline apartments. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
