Palm Jumeirah · Shoreline · Updated November 2026

Shoreline Apartment Wall Removal and Layout Change

Want a bigger living room or an open kitchen? Removing a wall in Shoreline starts with knowing what the wall does.

Before removing a wall in a Shoreline apartment, a structural engineer checks whether it carries load, using the as-built drawings and a site survey. Partition walls can usually be removed with the right drawings. Structural walls need a design, often with strengthening, and stamped calculations. Either way, the Nakheel NOC comes first and the Trakhees permit follows for the layout change.

FirstStructural check
NOCNakheel
PermitTrakhees

Wall types

What the check tells you

WallWhat it meansNext
Partition (non-load-bearing)Usually removableDrawings, Nakheel NOC, Trakhees permit
Load-bearing or shear wallCarries load or stabilityStructural design, calculations, Trakhees
Wall with services insidePipes or cables to rerouteMEP drawings

Official sites: Trakhees | Dubai Civil Defence

What you need to know

  • Check before you break.
  • Partition walls are simpler.
  • Structural walls need design.
  • Trakhees for the layout.

Documents you will need

  • Photos of the wall
  • Apartment layout
  • As-built drawings, if you have them
  • Title deed

How it works

Removing a wall

1. Survey

Wall check.

2. Design

Calculations.

3. NOC

Nakheel.

4. Permit

Trakhees.

Already done

Works already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Wall removal: questions

Can I remove any wall in my Shoreline apartment?

Not without a check. Load-bearing walls need a structural design.

Who confirms the wall type?

Our structural engineers, from the drawings and a site survey.

Do I need a Trakhees permit to remove a partition?

A layout change needs the permit after the Nakheel NOC.

Can you design an opening instead?

Yes. See wall opening design.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise. Nakheel and Trakhees fees are separate.

Who can help?

Structural Solutions checks and designs wall removals in Shoreline apartments. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading