Palm Jumeirah · Shoreline · Updated November 2026

Shoreline Kitchen and Bathroom Renovation Approval

Kitchens and bathrooms are the most common Shoreline renovations. The approval depends on whether services move.

A kitchen or bathroom renovation in the Shoreline Apartments needs the Nakheel NOC. If the kitchen or bathroom moves, or the drainage, water supply, power or extract changes, a Trakhees permit follows, with MEP drawings. Waterproofing in wet areas is checked carefully, because a leak reaches the apartment below. Replacing cabinets and tiles in the same layout is a smaller scope that we confirm for you.

NOCNakheel
Services moveTrakhees permit
Key riskLeaks below

Scope

Kitchen and bathroom works

WorkApproval
Same layout, new finishesNakheel NOC; we confirm scope
Kitchen movedNakheel NOC and Trakhees permit
Open kitchen (wall removed)Structural check and Trakhees permit
Bathroom moved or addedNakheel NOC and Trakhees permit
New extract or AC in the kitchenMEP drawings and Trakhees permit
WaterproofingTest before tiling

Official sites: Trakhees | Dubai Civil Defence

What you need to know

  • Nakheel NOC first.
  • Moving services needs Trakhees.
  • Waterproofing tested.
  • Open kitchen needs a structural check.

Documents you will need

  • Current layout photos
  • New layout idea
  • Title deed
  • Contractor details

How it works

Renovating a kitchen or bathroom

1. Layout

Existing and new.

2. MEP

Drawings.

3. NOC

Nakheel.

4. Permit

If services move.

Already done

Works already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Kitchens and bathrooms: questions

Can I open my kitchen to the living room?

Often yes, after a structural check of the wall. See wall removal and layout changes.

Can I add a bathroom?

Yes, with drainage design, the Nakheel NOC and a Trakhees permit.

What if my renovation leaks to the unit below?

Stop the leak, repair the waterproofing and check whether the repair needs approval; we help with the file.

Do new cabinets need a permit?

Send us the scope; we confirm.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise. Nakheel and Trakhees fees are separate.

Who can help?

Structural Solutions prepares kitchen and bathroom drawings and approvals in Shoreline. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading