DIFC Retail and Office Unit Split
DIFC has office floors in Gate Avenue, the towers and the podium retail. Large units are often split into two suites for smaller firms and boutiques.
In DIFC, the split is approved first by DIFC and the building, then DDA approves the works and Civil Defence approves the fire layout of both units. Office suites need their own door from the common corridor and their own exits; shops need their own frontage. For owned units, a DLD-registered surveyor prepares the unit plans after the works and the Dubai Land Department divides the deed.
Route
The DIFC route, step by step
| Step | Who |
|---|---|
| NOC for the split | DIFC and the building |
| Works approval | DDA |
| Fire layout | Civil Defence |
| Title deeds (owned units) | DLD-registered surveyor, then DLD |
Offices or retail
Office suite or shop: what differs
| Unit | Main design point |
|---|---|
| Office floor | Corridor doors and AC zones for two suites |
| Podium or Gate Avenue retail | Two frontages and signs within the DIFC look |
| Restaurant | Food Safety layout for each outlet |
Official sites: DDA | Dubai Civil Defence | Dubai Land Department
What you need to know
- DIFC and building first.
- DDA works.
- DCD fire.
- Suites need corridor doors.
Documents you will need
- Title deed or lease of the DIFC unit
- Building name and unit number
- Photos: office floor
- Your plan for the two units
How it works
Splitting a unit in DIFC
1. Review
Your DIFC unit.
2. DIFC and the building
NOC for the split.
3. DDA
Works approval.
4. Civil Defence
Fire layout.
5. DLD-registered surveyor
Title deeds (owned units).
6. Works
Split built and inspected.
Questions
DIFC Retail and Office Unit Split: questions
Who approves a unit split in DIFC?
DIFC and the building, then DDA, then Civil Defence.
Can I split a DIFC office into two suites?
Usually yes. See office unit splitting.
Can I get two title deeds?
Yes, for owned units: after the approved works, a DLD-registered surveyor prepares the unit plans and the Dubai Land Department divides the deed. See DLD unit division process.
Is DIFC merging the same?
Yes. See DIFC shop merging.
What does it cost?
Our fee depends on the drawings and the scope; we review and advise. The works, the developer or mall fees and the authority fees are separate, and we list them for your unit before you commit.
Who can help?
Structural Solutions handles DIFC splits with DIFC, the building, DDA and DCD. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
