Al Barsha · Unit splitting · Updated November 2026

Al Barsha Shop Split Approval

Al Barsha has street shops under residential buildings and units around Mall of the Emirates. Building shops follow the Dubai Municipality route.

In Al Barsha, the owner or landlord and the building approve the split first, then Dubai Municipality approves the works and Civil Defence approves the fire layout of both units. If the building is jointly owned and you want two title deeds, a DLD-registered surveyor prepares the plans and the Dubai Land Department divides the deed. Units inside Mall of the Emirates follow the mall route.

FirstOwner and building
WorksDubai Municipality
FireCivil Defence

Al Barsha

Al Barsha shop or Mall of the Emirates?

UnitRoute
Street shop in a buildingOwner and building, Dubai Municipality, DCD
Inside Mall of the EmiratesMall management, then Dubai Municipality and DCD
Whole building owned by one landlordUsually a lease split, no deed change

Official sites: Dubai Municipality | Dubai Civil Defence | Dubai Land Department

What you need to know

  • Owner and building first.
  • Dubai Municipality works.
  • DCD fire.
  • MoE: mall route.

Documents you will need

  • Title deed or lease
  • Building name
  • Photos
  • Split idea

How it works

Splitting an Al Barsha shop

1. Check

Building and unit.

2. Approval

Owner, building.

3. DM

Works.

4. DCD

Fire.

5. Works

Split built.

6. Deeds

If jointly owned.

Questions

Al Barsha shop split: questions

Who approves a shop split in Al Barsha?

The owner and the building, then Dubai Municipality, then Civil Defence.

What about Mall of the Emirates?

Mall management first, then Dubai Municipality and DCD. See splitting a shop unit in a Dubai mall.

My landlord owns the whole building. Do I need DLD?

Usually not; the split is a lease change.

Is merging in Al Barsha the same?

Yes. See Al Barsha shop merging.

What does it cost?

Our fee depends on the drawings and the scope; we review and advise. The works, the developer or mall fees and the authority fees are separate, and we list them for your unit before you commit.

Who can help?

Structural Solutions handles Al Barsha shop splits through Dubai Municipality and DCD. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading