JBR and The Walk Shop Split

Shops on The Walk at JBR face heavy footfall and high rents, so a large unit can be worth more as two. The route runs through the building, Dubai Holding and DDA.

In JBR and on The Walk, the building and Dubai Holding approve the split first, then DDA approves the works and Civil Defence approves the two new layouts. Shopfront and signage changes on The Walk follow the community design rules, so the new frontage is part of the submission. For two title deeds, a DLD-registered surveyor prepares the plans after the works and the Dubai Land Department divides the deed.

NOCBuilding, Dubai Holding
WorksDDA
FrontageCommunity design rules

On The Walk

What is different for a JBR shop split

ItemWhat to expect
New shopfrontTwo frontages must match the building and community look
SignageEach unit applies for its own sign
Outdoor seatingIf a tenant wants it, separate approval
Works hoursBuilding rules on noisy works and deliveries

Official sites: DDA | Dubai Civil Defence | Dubai Land Department

What you need to know

  • Dubai Holding NOC.
  • DDA works.
  • Two shopfronts designed.
  • DCD fire.

Documents you will need

  • Title deed or lease
  • Building and unit
  • Photos of frontage
  • Split idea

How it works

Splitting a JBR shop

1. Review

Unit and frontage.

2. NOCs

Building, Dubai Holding.

3. DDA

Works.

4. DCD

Fire.

5. Works

Split built.

6. Deeds

DLD.

Questions

JBR shop split: questions

Who approves a shop split on The Walk?

The building and Dubai Holding, then DDA, then Civil Defence.

Can each unit have its own sign?

Yes, each applies for its own signage approval.

Is merging JBR shops the same?

The same route in reverse. See JBR shop merging.

Can I rent the two units to two tenants?

Yes, once the split is approved. See splitting a shop to rent to two tenants.

What does it cost?

Our fee depends on the drawings and the scope; we review and advise. The works, the developer or mall fees and the authority fees are separate, and we list them for your unit before you commit.

Who can help?

Structural Solutions handles JBR and The Walk shop splits. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.