DDA · Raft Foundation strengthening · Updated November 2026

Raft Foundation Strengthening Approval (DDA)

A raft foundation that must carry added floors or heavy loads, or that shows settlement, needs a foundation check and strengthening design. In DDA areas the raft strengthening goes through the Building Modification route with the specialist stamp.

A raft foundation is checked against the new loads, the soil investigation and any settlement. If it falls short, we design micro-piles through the raft, a thicker raft section or edge underpinning, and the design goes to DDA with the strengthening specialist stamp.

TypicalBuildings with added floors
StampStrengthening specialist
Before worksDDA No Objection

Why

Why raft foundations need strengthening

Buildings with added floors, heavy plant at ground level and basements with new pits.

ReasonNotes
Added floors or roof structuresMore load on the raft
Heavy equipment at ground levelLocal load
SettlementSoil and raft check
New openings or pits in the raftLift pits, tanks

What we check

What we check on the raft foundation

CheckWhy
Soil investigationRequired wherever a substructure is built
SettlementLevels and cracks above
New loadsAdded floors or heavy plant
GroundwaterUplift and works below water

Methods

Raft Foundation strengthening methods we design

A specialist contractor applies them. The DDA route is on DDA strengthening approval.

MethodWhat it does
Micro-piles through the raftLoad taken deeper
Raft thickening or new raft sectionMore capacity
Underpinning at the edgesEdge support
Soil investigationRequired wherever a substructure is built

Official sites: DDA | Dubai Building Code

What you need to know

  • Soil investigation first: required wherever a substructure is built.
  • Specialist stamp on the design.
  • No Objection: works start after DDA.
  • Damaged? See raft foundation restoration.

Documents you will need

  • What is planned on the raft foundation and why
  • As-built drawings, if available
  • Photos

How it works

Raft Foundation strengthening, step by step

1. Assess

Soil investigation.

2. Design

Raft Foundation strengthening.

3. Stamp

Specialist.

4. DDA

Approval.

5. Works

Supervised.

Questions

Raft Foundation strengthening questions

Do I need DDA approval to strengthen a raft foundation?

Yes. Structural works on a completed building in a DDA area need the Building Modification approval and the specialist stamp before the works start.

Do I need a soil test to strengthen a raft?

Usually yes. A soil test is needed wherever a substructure is built or changed.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.