Fit-Out Done Without Approval in Dubai: What to Do
Your office, shop or restaurant was fitted out without the landlord NOC, the fit-out permit or the Civil Defence approval. Built fit-outs take an as-built route, not the new works route. We survey the unit and help you from there.
A fit-out that is already built does not go through the new fit-out route. It takes an as-built route, and a fine may apply, depending on the case. Fire safety matters most here, so we survey the unit, prepare the as-built drawings including the fire safety layout, and advise you on the route for your case.
What we check
What we look at in a built fit-out
| Item | Why it matters |
|---|---|
| Partitions and ceilings | Layout and fire rating |
| Exits and escape routes | Civil Defence requirements |
| Fire alarm and sprinklers | Changed by the new layout or not |
| Kitchen, if any | Food layout and extraction |
| Mezzanine or heavy equipment | Structure and floor loads |
Related
Related guides
| Topic | Guide |
|---|---|
| Fit-out NOC (new works) | Fit-out NOC in Dubai |
| As-built drawings | As-built drawings |
| Unauthorised works | Unauthorised works |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence
What you need to know
- Built fit-outs take the as-built route.
- Fire safety is the first check.
- A fine may apply, depending on the case.
- The landlord or building management is involved.
Documents you will need
- Lease or title deed
- Trade licence
- Photos of the unit
- Any notice from the landlord or authority
How it works
How we help with a built fit-out
1. Tell us
Unit and building.
2. Site visit
We see what was built.
3. Survey
Measured on site.
4. Drawings
As-built drawings.
5. Structure
Report if needed.
6. Advice
The route for your case.
Already done
What to do now
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Built fit-out questions
Does it follow the normal NOC route?
No. Built works take an as-built route, not the new works route. Contact us and we will help you accordingly.
Will I get a fine?
The developer or the authority may apply a fine, depending on the case. We cannot say more until we review your case.
Does a built fit-out need Civil Defence?
Fire safety is checked in every fit-out. We include the fire safety layout in the as-built drawings.
Can I keep trading while this is sorted?
It depends on the case. Contact us and we will advise you.
Who can help?
Structural Solutions reviews what was built, surveys the site, prepares the as-built drawings and the structural report, and advises you on the route for your case. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.