Rooftop Padel Court: Structural Check in Dubai

Putting a padel court on a roof starts with what the roof can carry.

A rooftop padel court adds the slab or decking, the steel frame, the glass and players on top of the roof, plus wind on the glass at height. Our engineers check the roof slab from the as-built drawings, design any spreader beams or strengthening, the anchors and waterproofing details, and prepare the calculations for building management and the authority.

What we check first

  • Site: Beach, villa, rooftop or plot
  • Court: Open or covered
  • Structure: Frame, glass, canopy
  • Ground: Slab, sand or roof
  • Lighting: Floodlights and neighbours
  • Route: Landlord or developer, then authority

Documents you will need

  • Site location and plot or unit details
  • Photos of the site and the ground or roof
  • Court supplier drawings, if you have them
  • Title deed, tenancy or landlord details

Route

How a padel court is approved

Landlord or developer first, then the authority for the area.

StepApproval routeGuides
Site check
Our engineers
The site, the ground or roof below and what you want to build.—
Design
Structural Solutions
Court layout, frame, glass panels, canopy and foundations, with stamped calculations.—
Landlord or developer
Meraas, the developer or the landlord
Approval for the court on their land or in their community.—
Permit
The authority for the area
Dubai Municipality, DDA, Trakhees or the area authority, depending on the location.—
Civil Defence
Dubai Civil Defence
Where it applies, for example covered courts and indoor facilities.—
Completion
Authorities
Inspection after the works.—

How it works

How it works

1. Send the details

Location, photos and the court you want.

2. Route

Landlord or developer, then the authority.

3. Design

Frame, glass, canopy, foundations.

4. Approvals

We submit and follow up.

5. Works

Your court supplier builds to the drawings.

6. Completion

Inspection, then play.

What causes problems

  • Building the court before the approvals
  • Supplier drawings without stamped structural calculations
  • Canopies and glass not designed for Dubai wind

Planning a padel court?

Check the site first

Send us three things on WhatsApp:

  1. Location and photos
  2. Open or covered court
  3. Supplier drawings, if any

We design the frame, glass, canopy and foundations, and handle the approvals.

Questions

Questions

Can any roof take a padel court?

No. The roof capacity is checked first.

What if the roof is not strong enough?

Spreader beams or strengthening are designed where possible.

Wind at height?

The glass and frame are designed for it.

Who approves it?

Building management or the landlord, then the authority.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.