Padel Court Slab and Foundation Design in Dubai
The slab under the court holds the frame, the glass and the canopy.
A padel court sits on a level slab that carries the steel posts and the glass panels, and anchors them against wind. Our engineers design the slab, the post anchors and any footings for canopies or lighting masts, for the ground on the site: sand, fill or an existing slab, with drainage falls kept under the turf.

Official sources: Dubai Municipality, Dubai Civil Defence
What we check first
- Site: Beach, villa, rooftop or plot
- Court: Open or covered
- Structure: Frame, glass, canopy
- Ground: Slab, sand or roof
- Lighting: Floodlights and neighbours
- Route: Landlord or developer, then authority
Documents you will need
- Site location and plot or unit details
- Photos of the site and the ground or roof
- Court supplier drawings, if you have them
- Title deed, tenancy or landlord details
Route
How a padel court is approved
Landlord or developer first, then the authority for the area.
| Step | Approval route | Guides |
|---|---|---|
| Site check Our engineers | The site, the ground or roof below and what you want to build. | — |
| Design Structural Solutions | Court layout, frame, glass panels, canopy and foundations, with stamped calculations. | — |
| Landlord or developer Meraas, the developer or the landlord | Approval for the court on their land or in their community. | — |
| Permit The authority for the area | Dubai Municipality, DDA, Trakhees or the area authority, depending on the location. | — |
| Civil Defence Dubai Civil Defence | Where it applies, for example covered courts and indoor facilities. | — |
| Completion Authorities | Inspection after the works. | — |
How it works
How it works
1. Send the details
Location, photos and the court you want.
2. Route
Landlord or developer, then the authority.
3. Design
Frame, glass, canopy, foundations.
4. Approvals
We submit and follow up.
5. Works
Your court supplier builds to the drawings.
6. Completion
Inspection, then play.
Related padel court questions
What causes problems
- Building the court before the approvals
- Supplier drawings without stamped structural calculations
- Canopies and glass not designed for Dubai wind
Planning a padel court?
Check the site first
Send us three things on WhatsApp:
- Location and photos
- Open or covered court
- Supplier drawings, if any
We design the frame, glass, canopy and foundations, and handle the approvals.
Questions
Questions
Can a court go on an existing slab?
Sometimes. We check the slab and the anchors first.
Beach sand?
Footings or a slab are designed for the site.
Drainage?
The slab and the turf are designed to drain.
Who builds it?
Your court supplier or contractor, to our drawings.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.