Padel courts · Structure · Approvals

Padel Court Slab and Foundation Design in Dubai

The slab under the court holds the frame, the glass and the canopy.

A padel court sits on a level slab that carries the steel posts and the glass panels, and anchors them against wind. Our engineers design the slab, the post anchors and any footings for canopies or lighting masts, for the ground on the site: sand, fill or an existing slab, with drainage falls kept under the turf.

What we check first

  • Site: Beach, villa, rooftop or plot
  • Court: Open or covered
  • Structure: Frame, glass, canopy
  • Ground: Slab, sand or roof
  • Lighting: Floodlights and neighbours
  • Route: Landlord or developer, then authority

Documents you will need

  • Site location and plot or unit details
  • Photos of the site and the ground or roof
  • Court supplier drawings, if you have them
  • Title deed, tenancy or landlord details

Route

How a padel court is approved

Landlord or developer first, then the authority for the area.

StepApproval routeGuides
Site check
Our engineers
The site, the ground or roof below and what you want to build.—
Design
Structural Solutions
Court layout, frame, glass panels, canopy and foundations, with stamped calculations.—
Landlord or developer
Meraas, the developer or the landlord
Approval for the court on their land or in their community.—
Permit
The authority for the area
Dubai Municipality, DDA, Trakhees or the area authority, depending on the location.—
Civil Defence
Dubai Civil Defence
Where it applies, for example covered courts and indoor facilities.—
Completion
Authorities
Inspection after the works.—

How it works

How it works

1. Send the details

Location, photos and the court you want.

2. Route

Landlord or developer, then the authority.

3. Design

Frame, glass, canopy, foundations.

4. Approvals

We submit and follow up.

5. Works

Your court supplier builds to the drawings.

6. Completion

Inspection, then play.

What causes problems

  • Building the court before the approvals
  • Supplier drawings without stamped structural calculations
  • Canopies and glass not designed for Dubai wind

Planning a padel court?

Check the site first

Send us three things on WhatsApp:

  1. Location and photos
  2. Open or covered court
  3. Supplier drawings, if any

We design the frame, glass, canopy and foundations, and handle the approvals.

Questions

Questions

Can a court go on an existing slab?

Sometimes. We check the slab and the anchors first.

Beach sand?

Footings or a slab are designed for the site.

Drainage?

The slab and the turf are designed to drain.

Who builds it?

Your court supplier or contractor, to our drawings.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading