Kite Beach · Meraas · Dubai Municipality

Beach Shade Structure Structural Calculations in Dubai

Shades on Dubai beaches, designed for wind, sand and salt.

Beach shade structures carry high wind loads and stand on sand in a corrosive environment. Our engineers calculate wind and uplift, design the posts, connections and foundations, and specify materials and coatings for salt air, with stamped calculations for the landlord and authority.

What we check first

  • Unit: Kiosk, café or restaurant
  • Landlord: Meraas
  • Authority: Dubai Municipality
  • Food: Food Safety layout
  • Fire: Civil Defence
  • Exposure: Sea wind, sand, salt air

Documents you will need

  • Unit location at Kite Beach and Meraas tenancy details
  • Photos and the current layout, if any
  • Concept design or what you want to change
  • Trade name and operator details for the Food Safety approval

Route

How approvals work at Kite Beach

Meraas first, then Dubai Municipality; Food Safety and Civil Defence for food outlets.

StepApproval routeGuides
Site check
Our engineers
The unit, the plot on the beach and what you want to build or change.—
Drawings
Structural Solutions
Layout, elevations, structure and services.—
Meraas approval
Meraas
Against the Kite Beach design and operating rules.Meraas approvals
DM permit
Dubai Municipality
Fit-out or building permit for the works.DM approvals
Food Safety and DCD
Dubai Municipality and Civil Defence
Food Safety layout approval for food and drinks; Civil Defence for fire safety and gas.Food Safety
Opening
Authorities
Inspections before opening.—

How it works

How it works

1. Send the details

Unit, photos and what you want.

2. Route

Meraas, then Dubai Municipality.

3. Drawings

Layout, structure, services.

4. Meraas

Design approval.

5. DM, Food Safety, DCD

Permit and approvals.

6. Opening

Inspections, then open.

Unit at Kite Beach?

Check your plans first

Send us three things on WhatsApp:

  1. Unit type and location
  2. Photos or concept design
  3. What you want to build or change

We prepare the drawings and structure, and handle the Meraas, Dubai Municipality, Food Safety and Civil Defence approvals.

Questions

Questions

Which structures?

Pergolas, tensile shades, umbrellas and canopies.

Foundations on sand?

Designed for the site.

Corrosion?

Included in the design.

Approval?

Landlord, then the authority for the beach.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading