Kiosks · Permits · Engineering

Kiosk Power Supply and Electrical Load in Dubai

Getting power to a kiosk.

Kiosks usually take power from the landlord’s supply in malls; outdoor kiosks may need a new or upgraded connection. The electrical load of the equipment is calculated and shown on the drawings, and DEWA is involved where a new connection is needed. We coordinate the electrical drawings with the approvals.

What we check first

  • Location: Mall, outdoor, beach or park
  • Landlord: Mall, developer or operator
  • Authority: DM, DDA or Trakhees
  • Use: Food, coffee or retail
  • Structure: Size, materials, fixing
  • Services: Power, water, gas, drainage

Documents you will need

  • Location and landlord or mall details
  • Kiosk size and photos or a concept design
  • What the kiosk will sell (food, coffee, retail)
  • Tenancy contract or landlord letter

Route

How a kiosk gets approved

Landlord first, then the authority; Food Safety and Civil Defence where they apply.

StepApproval routeGuides
Site check
Our engineers
Location, landlord rules, size and what the kiosk will sell.—
Drawings
Structural Solutions
Layout, elevations and, for outdoor kiosks, structural calculations.Kiosk drawings
Landlord approval
Mall, developer or operator
Against their design and fit-out rules.—
Permit
Authority for the area
Dubai Municipality, DDA or Trakhees.—
Food Safety and DCD
Dubai Municipality and Civil Defence
Food Safety layout approval for food kiosks; Civil Defence for fire safety.Food Safety
Opening
Authorities
Inspections before the kiosk opens.—

How it works

How it works

1. Send the details

Location, size, what you sell.

2. Route

Landlord and authority.

3. Drawings

Layout and structure.

4. Landlord

Mall, developer or operator.

5. Permit

Authority, Food Safety, DCD.

6. Opening

Inspections, then open.

What causes problems

  • Building or installing before the approvals
  • Food layouts without the Food Safety approval
  • Outdoor kiosks without structural calculations

Planning a kiosk?

Check your kiosk first

Send us three things on WhatsApp:

  1. Location and landlord or mall
  2. Kiosk size and photos or concept
  3. What it will sell

We prepare the kiosk drawings and structure, and handle the landlord, authority, Food Safety and Civil Defence approvals.

Questions

Questions

Does every kiosk need DEWA?

Only where a new or upgraded connection is needed.

Who supplies power in a mall?

Usually the mall.

Do you calculate the load?

Yes, from the equipment list.

Can you include it in the drawings?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.