Kiosk Power Supply and Electrical Load in Dubai
Getting power to a kiosk.
Kiosks usually take power from the landlord’s supply in malls; outdoor kiosks may need a new or upgraded connection. The electrical load of the equipment is calculated and shown on the drawings, and DEWA is involved where a new connection is needed. We coordinate the electrical drawings with the approvals.

Official sources: Dubai Municipality, Dubai Civil Defence
What we check first
- Location: Mall, outdoor, beach or park
- Landlord: Mall, developer or operator
- Authority: DM, DDA or Trakhees
- Use: Food, coffee or retail
- Structure: Size, materials, fixing
- Services: Power, water, gas, drainage
Documents you will need
- Location and landlord or mall details
- Kiosk size and photos or a concept design
- What the kiosk will sell (food, coffee, retail)
- Tenancy contract or landlord letter
Route
How a kiosk gets approved
Landlord first, then the authority; Food Safety and Civil Defence where they apply.
| Step | Approval route | Guides |
|---|---|---|
| Site check Our engineers | Location, landlord rules, size and what the kiosk will sell. | — |
| Drawings Structural Solutions | Layout, elevations and, for outdoor kiosks, structural calculations. | Kiosk drawings |
| Landlord approval Mall, developer or operator | Against their design and fit-out rules. | — |
| Permit Authority for the area | Dubai Municipality, DDA or Trakhees. | — |
| Food Safety and DCD Dubai Municipality and Civil Defence | Food Safety layout approval for food kiosks; Civil Defence for fire safety. | Food Safety |
| Opening Authorities | Inspections before the kiosk opens. | — |
How it works
How it works
1. Send the details
Location, size, what you sell.
2. Route
Landlord and authority.
3. Drawings
Layout and structure.
4. Landlord
Mall, developer or operator.
5. Permit
Authority, Food Safety, DCD.
6. Opening
Inspections, then open.
Related kiosk questions
What causes problems
- Building or installing before the approvals
- Food layouts without the Food Safety approval
- Outdoor kiosks without structural calculations
Planning a kiosk?
Check your kiosk first
Send us three things on WhatsApp:
- Location and landlord or mall
- Kiosk size and photos or concept
- What it will sell
We prepare the kiosk drawings and structure, and handle the landlord, authority, Food Safety and Civil Defence approvals.
Questions
Questions
Does every kiosk need DEWA?
Only where a new or upgraded connection is needed.
Who supplies power in a mall?
Usually the mall.
Do you calculate the load?
Yes, from the equipment list.
Can you include it in the drawings?
Yes.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.