Architect of Record for Fit-Out Projects in Dubai
Offices, shops, clinics and restaurants inside existing buildings need the landlord NOC, the fit-out permit and Civil Defence approval. We act as Architect of Record for the fit-out: we sign the layout, structure and MEP and take it through each step.
A fit-out in Dubai usually goes: building or landlord NOC, then the fit-out permit from the area authority, then Dubai Civil Defence for fire safety, then the inspections. We act as Architect of Record for fit-out contractors, designers and tenants and sign the whole fit-out package.
Route
The fit-out approval route
| Step | Who |
|---|---|
| Building or landlord NOC | Building management, landlord or mall |
| Fit-out permit | DM, DDA, Trakhees, DMCC or DSO Authority |
| Fire safety drawings | Dubai Civil Defence; see fire drawings for a fit-out |
| Food layout, if any | DM Food Safety; see food safety |
| Inspections | Authority and DCD, then handover |
By type
Fit-out types
| Fit-out | Guide |
|---|---|
| Offices | Business Bay office example |
| Restaurants | AoR for restaurants |
| Mall shops | AoR for mall shops |
| Showrooms | AoR for showrooms |
| Clinics, gyms, schools | AoR for hotels, clinics and schools |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence
What you need to know
- Landlord NOC comes before the permit.
- Civil Defence applies to almost every fit-out.
- Partitions, ceilings and MEP are all part of the package.
- Heavy items may need a floor load check.
Documents you will need
- Tenancy contract
- Building or mall fit-out guide
- Base build drawings, if available
- Fit-out design
How it works
How we run a fit-out as Architect of Record
1. Design
From your designer.
2. NOC
Landlord or building.
3. Package
Layout, MEP, fire, structure.
4. Permit
Fit-out permit.
5. DCD
Fire approval.
6. Handover
Inspections.
Questions
Fit-out AoR questions
Who submits a fit-out in Dubai?
An approved consultant. As Architect of Record we submit the fit-out package.
Can the fit-out contractor submit?
The contractor builds; the submission goes through the consultant.
Is Civil Defence approval needed for a fit-out?
In almost every case, yes.
Do you work with fit-out contractors?
Yes, often. The contractor keeps the build; we handle the package and the approvals.
Who can help?
Structural Solutions acts as Architect of Record: we sign the whole package, architecture, structure and MEP, submit it as the approved consultant and follow the comments until the approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
