International Architect Needs a Local Architect of Record in Dubai
You designed a villa, a store or a building for a client in Dubai, and your practice is not an approved consultant here. We act as your local Architect of Record: we adapt your drawings to the Dubai codes, sign the whole package and submit it, while the design stays yours.
International architects work with a local Architect of Record in Dubai. You send the design, we check it against the Dubai Building Code, fire code and community rules, add the structure and MEP, sign the package and submit it to the authority. Your name stays on the design.
Working together
How we split the work with you
| Task | You | Us |
|---|---|---|
| Concept and design intent | Yes | We keep it |
| Adapting to Dubai codes | Review our mark-ups | Yes |
| Structure and MEP | Yes, designed and signed | |
| Developer or landlord NOC | Yes | |
| Authority submission and comments | Yes | |
| Design changes asked by the authority | Agree the change | Prepare and resubmit |
What to send
What we need from your office
| Item | Why |
|---|---|
| Plans, sections and elevations | The base for the approval drawings |
| Area schedule | Checked against the plot or unit limits |
| Material and finish intent | Fire and facade checks |
| CAD files | Saves redrawing from PDF |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Building Code
What you need to know
- Common changes are to exits, fire ratings, setbacks and heights.
- Your name stays on the design.
- One contact in Dubai for the client and the authority.
- Units: metric drawings are expected.
Documents you will need
- Design drawings (CAD preferred)
- Client and property details
- Any developer or landlord design guide
How it works
How we work with international architects
1. Send the design
CAD or PDF.
2. Code review
Mark-ups to you.
3. Package
Structure, MEP, fire.
4. Submission
By us.
5. Comments
Agreed with you.
6. Approval
Then construction.
Questions
Questions from international architects
Can a foreign architect submit drawings in Dubai?
Not unless the practice is an approved consultant with the authority. A local Architect of Record submits for them.
Will you change my design?
Only where the codes or rules need it, and we agree every change with you.
Do you also do the structure and MEP?
Yes. We sign the whole package.
Can you work with brands opening stores in Dubai?
Yes. See AoR for mall shops.
Who can help?
Structural Solutions acts as Architect of Record: we sign the whole package, architecture, structure and MEP, submit it as the approved consultant and follow the comments until the approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
