Shop extension · Malls

Can I Extend My Shop Into the Mall Corridor?

The corridor outside your mall shop looks like free space. It belongs to the mall.

Only if the mall management agrees. The corridor is a common area and usually part of the escape routes, so the mall decides first, and Civil Defence must accept the exits for everyone. If the mall agrees, the extension is approved by the authority for the area: Dubai Municipality, DDA or Trakhees. We prepare the drawings the mall and the authorities need.

Decides firstMall management
Key issueEscape routes
ThenAuthority and DCD
Can I Extend My Shop Into the Mall Corridor?

Official sources: RTA · Dubai Municipality · DDA · Trakhees · Dubai Civil Defence

What decides it

  • Ownership: The mall
  • Escape routes: For other shops
  • Shopfront: Moved forward
  • Fire safety: Exits and systems

Documents you will need

  • Trade licence and lease
  • Landlord or building NOC (or we request it with you)
  • Photos of the unit and the space in front
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your shop and area.

StepApproval routeGuides
NOC
Landlord, building or developer
Approval of the extension. In communities the developer approves first; in malls, the mall management.—
Structure
Consultant
Openings, mezzanines or new structures checked and designed.—
Authority
DM, DDA or Trakhees
We submit the drawings as your consultant.—
RTA
RTA
Where the extension uses the pavement or right of way on a public road.RTA right of way NOC
Civil Defence
DCD
Fire and life safety for the new layout.—
Completion
Authority and DCD
Inspection and completion.—

How it works

How we get it approved

1. Send us the details

Area, building, unit and what you want to add.

2. We confirm the route

Developer, RTA, authority and DCD.

3. Site check

Structure and the space.

4. Drawings

Layout, structure, fire safety.

5. Approvals

We submit and follow up.

6. Completion

Inspection, then you open.

What causes problems

  • Corridor needed for escape
  • Mall refusing
  • Moving the shopfront without approval

Extending your shop?

Get your route confirmed

Send us three things on WhatsApp:

  1. Area, building and unit number
  2. Photos of the unit and the space in front
  3. What you want to add

We confirm who approves it and handle the drawings and approvals.

Questions

Questions

Can I rent the corridor space?

That is for the mall to decide.

Does Civil Defence need to approve it?

Yes, exits and fire safety change.

Can you prepare the drawings?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.