DEWA · Load increase

DEWA Load Increase for a Villa Extension in Dubai

Adding rooms, a pool, a lift or more air conditioning to your villa can push the power demand above what your DEWA supply allows. Here is when you need a DEWA load increase and how we handle it.

DEWA load increase for a villa

When an extension or new equipment raises the villa’s electrical load beyond the existing supply, DEWA has to approve a load increase. We calculate the new total load, update the load schedule and electrical drawings, and submit them to DEWA. We plan it with the extension approvals so the power is ready when the works finish.

Needed whenThe load exceeds the supply
Approved byDEWA
We submitUpdated load schedule and drawings

What usually needs more load

  • Extensions: New rooms and air conditioning
  • Pools: Pumps, heaters and lighting
  • Lifts: Villa lifts
  • Kitchens: Heavy kitchen equipment
  • EV charging: Car chargers

Documents you will need

  • Current DEWA account details
  • Extension or equipment details
  • Existing electrical drawings, if available

How it works

How the load increase works

1. Your property

Plot, type and use.

2. Load calculation

The total electrical load and the load schedule.

3. Electrical drawings

Prepared to DEWA requirements.

4. Submission

We submit to DEWA.

5. DEWA review

Comments answered and resubmitted if needed.

6. Approval

Then the connection works and DEWA inspection.

Common problems

  • Load increase left until the works are finished
  • Pool or lift loads not counted
  • Old drawings that do not match the villa

Need a DEWA connection?

Get your power supply approved

Send us three things on WhatsApp:

  1. Your affection plan or title deed
  2. The property type and area
  3. The approved drawings, if you have them

We prepare the electrical drawings and load calculations and submit them to DEWA for you.

Questions

Villa load increase questions

Do I need a DEWA load increase for my villa extension?

If the extension or new equipment raises the load beyond the existing supply, yes.

Who submits it?

We prepare the load schedule and drawings and submit them to DEWA.

When should I start?

With the extension approvals, so the power is ready when the works finish.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading