DEWA New Connection in Dubai: How to Apply

Building a new villa or building, or bringing power to a plot for the first time? You need a DEWA new connection. Here is how it works, what DEWA needs, and how we handle it for you.

DEWA new connection

A DEWA new connection gives a new villa, building or plot its power supply. DEWA approves it based on the electrical load and the electrical drawings. We calculate the load, prepare the electrical drawings and load schedule to DEWA requirements, submit them to DEWA and answer any comments until approval. The connection works and DEWA inspection follow before the power is connected.

Needed forNew villas, buildings and plots
Approved byDEWA
We submitDrawings and load calculations

What the new connection application covers

  • Electrical load: Total load of the property
  • Load schedule: Breakdown by circuit and equipment
  • Electrical drawings: To DEWA requirements
  • Supply point: Where the power comes in
  • Inspection: Before the power is connected

Documents you will need

  • Affection plan and title deed
  • Approved building drawings
  • Owner ID or trade licence
  • Details of major equipment, if any

How it works

How the DEWA new connection works

1. Your property

Plot, type and use.

2. Load calculation

The total electrical load and the load schedule.

3. Electrical drawings

Prepared to DEWA requirements.

4. Submission

We submit to DEWA.

5. DEWA review

Comments answered and resubmitted if needed.

6. Approval

Then the connection works and DEWA inspection.

DEWA guides

What delays a new connection

  • Load calculation missing or incomplete
  • Drawings not to DEWA requirements
  • Building drawings not approved yet
  • Major equipment loads left out

Need a DEWA connection?

Get your power supply approved

Send us three things on WhatsApp:

  1. Your affection plan or title deed
  2. The property type and area
  3. The approved drawings, if you have them

We prepare the electrical drawings and load calculations and submit them to DEWA for you.

Questions

DEWA new connection questions

How do I apply for a DEWA new connection?

We calculate the electrical load, prepare the electrical drawings and load schedule, and submit them to DEWA for you.

Who submits the application to DEWA?

We do. We prepare and submit the drawings and load calculations.

What does DEWA need?

The electrical load, the load schedule and the electrical drawings, with the property documents.

What is the DEWA connection NOC?

It is DEWA’s NOC for the new power supply. See our DEWA connection NOC guide.

Is there an inspection?

Yes, DEWA inspects before the power is connected.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.