Cut and Fill Quantity Calculation in Dubai
A cut and fill calculation shows how much sand will be excavated, how much is reused and how much leaves or enters the plot. It is the basis for sand removal and sand supply approvals.
Cut and fill calculation
We compare the existing levels from a site survey with the design levels and the excavation from the drawings: basement, pool, foundations and landscaping. The result is the cut volume, the fill volume, the sand reused on site and the surplus or shortfall. These quantities go into the sand removal or supply application and help plan the trucks.

Official sources: Dubai Municipality · Dubai Development Authority · Trakhees · RTA
What goes into the calculation
- Existing levels: From a site survey
- Design levels: From the approved drawings
- Excavation: Basement, pool and foundations
- Bulking: Excavated sand takes more space than in the ground
Documents you will need
- Site survey, or we carry it out
- Architectural and structural drawings
- Landscape levels, if any
How it works
How we prepare it
1. Survey
Existing levels.
2. Drawings
Design levels and excavation.
3. Calculation
Cut, fill and balance.
4. Report
Quantities for the application.
5. Application
Sand removal or supply.
Related guides
- Sand removal permit
- Sand supply NOC
- Plot levelling
- Foundation calculations
Common mistakes
- Using old or estimated levels
- Forgetting the pool or basement volume
- Ignoring sand that can be reused on site
Need a sand removal or supply permit?
Get your route confirmed
Send us three things on WhatsApp:
- Your plot number and area
- The works: excavation, demolition, pool or levelling
- The rough quantity, if you know it
We confirm the route for your area, prepare the drawings and quantities and handle the approvals.
Questions
Cut and fill questions
What is a cut and fill calculation?
It compares existing and design levels to give the sand excavated, the sand filled, the sand reused and the surplus or shortfall.
Do I need it for a sand removal permit?
The application needs the quantities, and the calculation gives them.
Do you need a survey?
Yes. Accurate existing levels come from a site survey, which we carry out.
Do you prepare it?
Yes, with the drawings and the approvals.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.