Strong Room and Vault Structural Assessment in Dubai
Strong rooms and vault doors are among the heaviest items in any fit-out. Banks, jewellers and family offices need the floor checked before they go in. Here is what we assess.
Strong room assessment
A strong room adds heavy walls, a vault door and safes to an existing floor. We run the structural analysis of the slab from the as-built drawings for the full layout, design steel bases and anchoring where needed, and check the delivery route and lift for the vault door. You receive a full report for building management, the project’s consultant or the authorities.

Official sources: Dubai Municipality · Dubai Development Authority · Trakhees
What we assess
- Strong room walls: Weight along the floor
- Vault door: Large concentrated load
- Safes inside: Point loads
- Delivery: Route and lift for the door
Documents you will need
- Strong room layout
- Vault door and safe datasheets
- As-built drawings, if available
How it works
How the assessment works
1. Item details
Weight, footprint and datasheet.
2. As-built drawings
We obtain or review them.
3. Analysis
Slab capacity against the added load.
4. Load spreading
Steel base or spreader plate and anchoring, if needed.
5. Route and lift
Delivery path and lift capacity.
6. Full report
Detailed analysis for review.
Related guides
- Safe installation floor load
- Office floor load
- Load spreading plate
- Delivery route and lift check
Common problems
- Vault door delivered before the route check
- Walls added without checking the slab
- Safes grouped mid-span
Need a floor load check?
Check the floor before delivery
Send us three things on WhatsApp:
- The item, its weight and footprint (datasheet)
- The area, the floor and where the item will sit
- As-built drawings, if you have them
We run the analysis from the as-built drawings, design the spreader plate and anchoring if needed, check the route and the lift, and send you the full report.
Questions
Strong room questions
Does a strong room need a structural assessment?
Yes, the walls, the door and the safes add heavy loads to the floor.
Do you check the vault door delivery?
Yes, the route and the lift.
Who reviews the report?
Building management, the project’s consultant or the authorities.