Completion Certificate Delayed in Dubai: What to Do
Is your completion certificate delayed? There is usually a specific item holding it. Send us the file, and we will find it and close it.
If your completion certificate is delayed, something specific is usually holding it: open inspection comments, works that differ from the approved drawings, missing as-built drawings, a missing owner letter, or a developer inspection that is still open. Sometimes older unapproved works come up too. The way forward is to find out which one applies, not to reapply. Send us the permit number, the approved drawings and any comments. We review the file, close each item and request the inspections again.
Official sites: Dubai Municipality · Dubai Development Authority · Trakhees
Where completion certificates usually get stuck
- Inspection comments: Each comment needs answering, by correcting the works or updating the drawings.
- Developer side: The developer inspection can hold things up as well as the authority’s.
- Contractor left: The certificate does not depend on the original contractor.
- Selling soon: Tell us. An open permit can delay a sale, as buyers and banks may ask for it to be closed.
Documents you will need
- Permit number and NOC
- Approved drawings
- Any inspection comments received
- Photos of the finished works
- Title deed and owner ID
How it works
How we unblock a delayed completion certificate
1. Review the file
Drawings, comments and documents.
2. Find the cause
We tell you what is holding it.
3. Close each item
Corrections, revised drawings and missing documents.
4. Inspect again
We request the inspections again and attend.
5. Certificate
The authority issues it, closing the permit.
Who does what
Who can be holding it
Structural Solutions
Prepares the as-built drawings and the owner letter pack, and requests and attends the inspections. We are a consultancy, not the developer or the authority.
Request online →Developer
Inspects the works against the approved NOC drawings. It does not issue the certificate. Any refundable deposit is returned after clearance.
Authority
DM, DDA or Trakhees carries out the final inspection and issues the certificate.
Villa completion certificate →Related guides
Common causes
- Open inspection comments
- Works differ from the approved drawings
- As-built drawings or owner letter missing
- Developer inspection still open
- Older unapproved works found
Questions
Questions people ask
Why is my completion certificate delayed?
Usually because of open comments, differences from the approved drawings, or missing documents. We check your file to find which applies.
Should I apply again?
Find the cause first, because the same item would come up again.
Can the delay affect selling?
An open permit can delay a sale. Buyers and banks may ask for it to be closed.
My contractor stopped responding. What now?
It can still be done. A consultant prepares the completion pack.
How long will it take?
It depends on the item holding it. We review the file and advise you.
Related guides
