Arabian Ranches Townhouse Extension Rules: What Emaar Allows

An Arabian Ranches townhouse extension depends on the unit and plot, and Emaar reviews each case. Send us your unit type and idea and we will advise.

It depends on your unit, your plot and Emaar’s review, so each case is different. A neighbour NOC may be needed. Send us your unit type and idea, and we will advise on your case. Extra service rooms are only possible on end and corner units, not middle units. Emaar charges AED 1,000 per sq ft of added GFA, subject to Emaar review. After the Emaar NOC, structural works need a DDA building permit.

WhereDepends on the unit
RateAED 1,000 per sq ft
RouteEmaar NOC, then DDA permit

Emaar’s guide

Arabian Ranches townhouse modification rules

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
ExtensionDepends on the unit and plot. Emaar reviews each case, and a neighbour NOC may be needed. Ask us and we will advise.
Front and sideAsk us: Emaar reviews each case.
Service blockEnd and corner units only, in the side alley, not on the shared wall. Not allowed on middle units.
LookSame finishes, materials, sills and lintel levels. The elevation does not change.
Patio and main doorEnclosing the patio or moving the door onto an existing slab is reviewed as added area.
CarportStays parking. No roll-up doors and no extra parking.
Cat laddersNot allowed.
RateAED 1,000 per sq ft of added GFA, subject to Emaar review.

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Middle units: No service block; a rear extension only, with a neighbour NOC.
  • End and corner units: A service block is possible in the side alley, not on the shared wall.
  • Shared walls: Your neighbours’ NOC is part of the application.
  • Same look: Finishes, sills and lintel levels match; the elevation does not change.
  • No higher bands: Townhouses do not have the villa bands above 10%.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Can I extend my Arabian Ranches townhouse?

It depends on the unit, subject to Emaar review. Ask us and we will advise.

Can I build a maid room on a middle townhouse?

No, service blocks are only allowed on end and corner units.

Can I extend the front or side?

Ask us: Emaar reviews each case.

How much does Emaar charge for a townhouse extension?

AED 1,000 per sq ft of added GFA, subject to Emaar review.

Who issues the permit?

DDA, after the Emaar NOC.

Can I add a cat ladder?

No, cat ladders are not allowed on townhouses.