Nakheel NOC Rejected or Returned: Common Reasons and Fixes

โœ๏ธ Written by our engineers๐Ÿ›๏ธ Dubai approvals guideโœ… Independent consultant
As-built drawings and measured survey in Dubai โ€” Structural Solutions

When a Nakheel NOC is rejected or returned, it is usually for a fixable reason: drawings not supplied as PDF plus AutoCAD in DLTM coordinates, drawings that do not match the villa plans, missing structural calculations, or unapproved works already on the Villa Status Report (VSR). Correct the comments and resubmit.

Last checked: November 2026. Official sources: Nakheel ยท Trakhees

A returned application is frustrating, but it rarely means the works cannot be approved. Most comments point to something missing or unclear in the submission. These are the reasons we see most often when a Nakheel NOC is rejected or returned.

Common reasons a Nakheel NOC is rejected

  • Drawings not in DLTM. Nakheel can ask for drawings as PDF plus AutoCAD in DLTM coordinates, especially where works sit near or outside the plot limit. See drawings rejected for not being in DLTM.
  • Drawings that do not match the villa. The drawings must start from the villa as it is. If the villa has changed since handover, the plans need updating first.
  • No structural calculations. Structural works and extensions need stamped structural calculations, which Trakhees also reviews.
  • Existing violations. Unapproved works already on the VSR can hold a new request until they are cleared.
  • Incomplete documents. Missing owner documents or unclear scope descriptions lead to comments.

How to fix and resubmit

  1. Read every comment and list what each one asks for.
  2. Get the villa plans. Nakheel provides villa plans to owners; where they are missing, the villa is surveyed and drawn as built.
  3. Revise the drawings and calculations to answer each comment.
  4. Clear any existing VSR violations, or include them in the application where Nakheel allows it.
  5. Resubmit.

After the NOC: Trakhees

The Nakheel NOC is only the first approval. Structural works then need a Trakhees building permit. If Trakhees returns comments, the same approach applies; see what to do when a Trakhees application is rejected.

Questions owners ask

Can I resubmit after a Nakheel NOC is rejected?

Yes. Correct the drawings and documents to answer each comment, then resubmit.

Why does Nakheel ask for DLTM drawings?

DLTM coordinates place the drawings exactly on the map, which shows which works are inside and outside the plot limit. Nakheel can ask for them as AutoCAD files alongside the PDF.

What if I do not have my villa plans?

Nakheel provides villa plans to owners. If they are not available or the villa has changed, we survey it and draw it as built.

Will old unapproved works affect my new NOC?

They can. Unapproved works on the VSR can hold a new request until they are cleared.

Do I need structural calculations for a Nakheel NOC?

For structural works and extensions, yes. Stamped structural calculations are part of the submission and Trakhees reviews them too.

Related service

Nakheel NOC resubmissions

Send us the comments. We revise the drawings and calculations and resubmit for you.

Nakheel approvals โ†’DLTM drawings โ†’

Send me the Nakheel comments

Need this approved?

Send us photos and the location. We will tell you which approvals apply and handle them for you.

Get a QuoteCall +971 55 339 4451

On this page

Have a question about your project?

Our engineers will tell you which developer NOC and authority approvals apply.

โ† Back to all guides