MEP consultant for architects in Dubai
An MEP consultant for architects designs and stamps the MEP for fit-outs and modifications, and handles the authority and Civil Defence submissions.
Architects working on fit-outs, villa modifications and small buildings in Dubai use us for the MEP design and calculations: HVAC, lighting, power, fire alarm and sprinklers, plumbing and drainage. We coordinate with the architectural drawings, stamp the MEP, and submit to the developer or landlord, the authority (Dubai Municipality, DDA or Trakhees) and Civil Defence. Structural calculations are also available in-house.

Official sources: Dubai Civil Defence · DEWA · Dubai Municipality
MEP consultant for architects: what you need to know
- MEP design: HVAC, electrical, fire, plumbing.
- Structural too: Stamped structural calculations in-house.
- Submissions: Developer, authority and DCD.
- No BOQ: Design and calculations only.
What to send us
- Interior design layout and ceiling plan
- Mall or landlord fit-out guide
- Lease or tenancy contract
- Trade licence
- Existing MEP drawings, if available
Who does what
From design to opening
We confirm the exact route for your mall or building.
| Step | Approval route | Guides |
|---|---|---|
| MEP design and calculations Structural Solutions | HVAC, lighting and power, fire alarm, sprinklers, plumbing, with calculations. | MEP package |
| Landlord or mall approval Consultant → mall or landlord | Stamped drawings reviewed by the mall or landlord fit-out team. | Consultant stamp |
| Authority permit, where needed Consultant → DM, DDA or Trakhees | Depending on the area and the mall or building. | Authority permit |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval, needed for every fit-out change. | DCD approval |
| Final inspection Mall, authority and DCD | DCD final inspection and completion before opening. | Sign-off |
How it works
How it works
1. Brief
Layout, ceiling plan and the landlord guide.
2. Design
MEP design and calculations.
3. Approvals
Mall or landlord, authority and DCD.
4. Handover
Final inspection and completion.
Questions
More questions about MEP consultant for architects
Do you also do structural?
Yes, in-house.
Which authorities?
Dubai Municipality, DDA, Trakhees and DCD.
Do you prepare a BOQ?
No.
Do you work outside Dubai?
We focus on Dubai.
Related guides
