Lighting design and lux calculations for retail shops in Dubai
Lighting design and lux calculations for a retail shop set the light levels, fittings layout and electrical load, prepared for mall approval.
We design shop lighting with lux calculations: general lighting, display and accent lighting, and emergency lighting. The calculations show the light levels across the sales floor and fitting rooms, and the lighting load feeds into the electrical load schedule. Emergency and exit lighting are coordinated with the fire safety design for Civil Defence (DCD).

Official sources: Dubai Civil Defence · DEWA · Dubai Municipality
Lighting design and lux calculations: what you need to know
- Light levels: Calculated across the shop.
- Display lighting: Often the biggest load in a boutique.
- Emergency lighting: Part of the DCD review.
- Coordination: With the interior design and ceiling.
What to send us
- Interior design layout and ceiling plan
- Mall or landlord fit-out guide
- Lease or tenancy contract
- Trade licence
- Existing MEP drawings, if available
Who does what
From design to opening
We confirm the exact route for your mall or building.
| Step | Approval route | Guides |
|---|---|---|
| MEP design and calculations Structural Solutions | HVAC, lighting and power, fire alarm, sprinklers, plumbing, with calculations. | MEP package |
| Landlord or mall approval Consultant → mall or landlord | Stamped drawings reviewed by the mall or landlord fit-out team. | Consultant stamp |
| Authority permit, where needed Consultant → DM, DDA or Trakhees | Depending on the area and the mall or building. | Authority permit |
| Civil Defence (DCD) Structural Solutions → DCD | Fire and life safety approval, needed for every fit-out change. | DCD approval |
| Final inspection Mall, authority and DCD | DCD final inspection and completion before opening. | Sign-off |
How it works
How it works
1. Brief
Layout, ceiling plan and the landlord guide.
2. Design
MEP design and calculations.
3. Approvals
Mall or landlord, authority and DCD.
4. Handover
Final inspection and completion.
Questions
More questions about lighting design and lux calculations
Do you do lux calculations?
Yes.
Do you choose the fittings?
We design the layout and performance; the designer selects the look.
Is emergency lighting included?
Yes, for DCD.
Does lighting affect DEWA?
Only if the total load needs an increase, which is rare in malls.