RTA · Footpaths
Do I need RTA approval to work on the footpath?
Yes. Works on the sidewalk, such as a new driveway or access, need RTA approval, including the sidewalk modification permit.
Yes. The footpath belongs to the road, so works on it, such as a new driveway, curb cut, access ramp or interlock, need RTA approval. For plot access, the route is the RTA access design study, the developer plot access NOC where applicable, the RTA construction NOC and the RTA sidewalk modification permit, with drawings in DLTM coordinates. Structural Solutions prepares the drawings and applies.
NeededYes
IncludesSidewalk modification permit
DrawingsIn DLTM coordinates
What you need to know
- Driveways: Follow the RTA access route.
- Developer NOC: Where the community has one.
- DLTM: Drawings in DLTM coordinates.
- Deposit: Refunded after close-out.
Documents you may need
- Title deed or trade licence
- Affection plan or site plan
- Site survey and drawings in DLTM
- Developer NOC where applicable
Who does what
Step by step
We confirm the exact route for your project.
| Step | Approval route | Guides |
|---|---|---|
| Drawings Structural Solutions | Layouts and drawings, in DLTM coordinates where required. | — |
| RTA application Consultant → RTA | The RTA NOC or permit for the works. | RTA approvals |
| Works Contractor | Carried out as approved. | — |
| Close-out RTA | Inspection and refund of any security deposit. | Deposit refund |
Questions
Related questions
Can I change the curb outside my villa?
Only with RTA approval.
What is the access design study?
The RTA study for a new plot access.
Do I need a site survey?
Yes, for DLTM drawings.
Who applies?
We do.
Related guides
Keep reading
Cranes, road closures and diversions
- RTA crane permit for truck and mobile cranes
- Do I need an RTA permit for a truck crane on the road?
- RTA road closure permit for construction
- How do I close part of a road for construction?
- RTA road diversion permit
- Temporary lane closure permit
- RTA footpath closure permit
- RTA permit for trucks delivering to a construction site
