RTA · Road Diversion
When do I need a road diversion permit in Dubai?
When your works block or change traffic on a road, for example for deliveries, cranes or works outside the plot.
You need an RTA road diversion permit when your works block, narrow or change traffic on a public road, for example for crane lifts, large deliveries, utility connections or construction works outside the plot. The application includes a traffic diversion layout. Structural Solutions prepares the drawings and applies to RTA for the permit.
WhenWorks affect traffic
Issued byRTA
IncludesTraffic diversion layout
What you need to know
- Lane closures: Need RTA approval too.
- Drawings: Traffic layout for the diversion.
- Before works: The permit comes first.
- Plot access: Driveways follow the RTA access route.
Documents you may need
- Title deed or trade licence
- Affection plan or site plan
- Site survey and drawings in DLTM
- Developer NOC where applicable
Who does what
Step by step
We confirm the exact route for your project.
| Step | Approval route | Guides |
|---|---|---|
| Drawings Structural Solutions | Layouts and drawings, in DLTM coordinates where required. | — |
| RTA application Consultant → RTA | The RTA NOC or permit for the works. | RTA approvals |
| Works Contractor | Carried out as approved. | — |
| Close-out RTA | Inspection and refund of any security deposit. | Deposit refund |
Questions
Related questions
Do I need a permit for a crane on the road?
Yes, if it affects traffic.
Is a lane closure the same?
It is a related RTA permit.
Who prepares the drawings?
We do.
Can works start before the permit?
No.
Related guides
Keep reading
Cranes, road closures and diversions
- RTA crane permit for truck and mobile cranes
- Do I need an RTA permit for a truck crane on the road?
- RTA road closure permit for construction
- How do I close part of a road for construction?
- RTA road diversion permit
- Temporary lane closure permit
- RTA footpath closure permit
- RTA permit for trucks delivering to a construction site