Do new columns need new foundations?

Usually yes. A new column needs a footing designed for its load, and a soil test is required for the new substructure.

The short answer

Usually yes. A new column carries load down to the ground, so it needs a footing designed for that load, unless it sits on an existing structure that has been checked and can carry it. Wherever a new substructure is built, a soil test is required. Structural Solutions designs the column and foundation and prepares stamped calculations for the approvals.

UsuallyYes, a new footing
Soil testFor the new substructure
CalculationsStamped

What you need to know

  • Load path: From the column to the ground.
  • Existing structure: Must be checked if the column sits on it.
  • Soil test: Required for new foundations.
  • Approvals: Developer NOC and building permit.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Soil test
Soil testing laboratory
Required wherever a substructure such as a foundation is built.Soil tests
Foundation design
Structural Solutions
Foundation and substructure calculations and drawings.Structural calculations
Shoring, where needed
Consultant → DM, DDA or Trakhees
Shoring design and approval where the excavation needs it.Shoring
NOC and permit
Developer and authority
The developer NOC first, then the building permit.Approvals
Inspection
Authority
Inspections and the completion certificate.—

Questions

Related questions

Can a new column sit on the existing slab?

Only if the slab is checked and can carry it.

Do steel columns need foundations too?

Yes.

Do I need a soil test?

Yes, for new foundations.

Who designs it?

Our engineers.