Structural Calculations · Staircases
Do I need structural calculations for a staircase?
For a new or changed structural staircase, yes. Steel and concrete stairs need stamped calculations, and steel works need a specialist stamp.
The short answer
Yes, for a new staircase or a change to a structural one, such as a new internal stair, a steel external stair or a stair to a roof room or mezzanine. The calculations check the stair, its supports and the slab or wall it connects to, and are stamped for the approvals. Steel stairs also need specialist verification and a stamp.
New stairsNeed calculations
Steel stairsPlus specialist stamp
ChecksStair and supports
What you need to know
- Connections: The stair must be fixed into a structure that can carry it.
- Openings: A new stair opening in a slab needs design.
- Calculations: Stamped for approval.
- Approvals: NOC and permit where required.
Documents you may need
- Title deed and owner ID
- Affection plan or site plan
- Existing drawings or as-built drawings
- Photos of the area
- Developer NOC (where the community has a developer)
Who does what
Step by step
We confirm the exact route for your project.
| Step | Approval route | Guides |
|---|---|---|
| Design brief You and us | The size, use and loads of the structure. | — |
| Calculations Structural Solutions | Stamped structural calculations to the codes used in Dubai. | Structural calculations |
| Drawings Structural Solutions | Structural drawings that match the calculations. | — |
| Approvals Developer and authority | Submitted with the NOC and the building permit. | Approvals |
| Inspection Authority | Inspection and completion. | Sign-off |
Questions
Related questions
Does cutting a slab for a new stair need approval?
Yes. It is a structural change.
Do spiral stairs need calculations?
Yes, if new or structural.
Can you design the stair?
We design the structure and stamp the calculations.
Does the stair add GFA?
It depends on the community guidelines.
Related guides
