How do engineers calculate the load of a rooftop pool?

They add the weight of the water, the pool structure, finishes, people and equipment, and check the slab, beams, columns and foundations below.

The short answer

Engineers add up every load the rooftop pool brings: the water (about 1,000 kg for every cubic metre), the pool shell and finishes, the people using it and the plant equipment. They then check that the roof slab, beams, columns and foundations below can carry it, and design any strengthening needed. Water also needs waterproofing and drainage design. Structural Solutions prepares the stamped calculations for the developer and authority approvals.

WaterAbout 1,000 kg per cubic metre
PlusStructure, finishes, people, equipment
CheckedSlab to foundations

What you need to know

  • Full load path: From the pool down to the foundations.
  • Strengthening: Designed where the structure is not enough.
  • Waterproofing: Part of the design.
  • Approvals: Developer NOC, permit and the pool environmental NOC.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Design brief
You and us
The size, use and loads of the structure.—
Calculations
Structural Solutions
Stamped structural calculations to the codes used in Dubai.Structural calculations
Drawings
Structural Solutions
Structural drawings that match the calculations.—
Approvals
Developer and authority
Submitted with the NOC and the building permit.Approvals
Inspection
Authority
Inspection and completion.Sign-off

Questions

Related questions

Can any roof take a pool?

No. The structure must be checked first.

Is an infinity pool heavier?

The overflow and balance tank add weight that must be included.

Do I need approval?

Yes, the developer NOC and the building permit.

Who prepares the calculations?

Our engineers, stamped for submission.