DEWA

Do I need DEWA approval for solar panels on my villa?

Yes. DEWA approves the solar connection. Before that, the roof structure is checked for the panels and frame, and in developer communities the developer NOC is needed.

The short answer

Solar panels add weight and wind load to the roof, so our engineers check the roof structure and the mounting first. In developer communities the developer approves the installation, then DEWA approves the connection. At sign-off, the panels and mounting are checked against the approved layout.

RoofStructural check of roof and frame
DeveloperNOC in developer communities
DEWAApproval of the connection

What is checked

  • Roof loads: Weight of panels and frame, and wind loads.
  • Mounting: Frame and fixings.
  • Layout: The approved panel layout.
  • Connection: DEWA approval.

Documents you will need

  • Title deed and owner ID
  • Developer NOC
  • Roof photos
  • Panel layout and frame details

Who does what

Step by step

The order can vary by community and authority; we confirm it for your project.

StepApproval routeGuides
Roof check
Structural Solutions
Roof structure and mounting check.Structural calculations
Developer NOC
Developer
Where the community has a developer.—
DEWA approval
DEWA
Approval of the solar connection.DEWA approvals
Sign-off
Inspectors
Panels and mounting checked.Solar sign-off

Questions

Related questions

Does DEWA approve solar panels?

Yes, DEWA approves the solar connection.

Do I need a roof check?

Yes, for the weight and wind load of the panels.

Do I need a developer NOC?

In developer communities, yes.

Can solar panels go on a car shade?

Yes, with a structural check of the car shade.

What does Structural Solutions do?

Roof check, calculations, the NOC and coordination of the DEWA step.

Related guides

Keep reading