Trakhees

What documents does Trakhees need for a villa extension?

Usually the title deed and owner ID, the affection plan, the Nakheel NOC (or the JGE NOC in Jumeirah Golf Estates), and drawings with stamped structural calculations prepared by an approved consultant.

The short answer

For a villa extension in a Trakhees area, the package combines ownership documents, the developer NOC and the technical drawings and calculations. In Nakheel communities, unapproved works flagged in a villa status report (VSR) should be resolved first, so the new extension is not held up.

OwnershipTitle deed and owner ID
DeveloperNakheel or wasl NOC
TechnicalDrawings and stamped calculations

Documents explained

  • Nakheel NOC: Applied for through the Nakheel online portal.
  • JGE NOC: Through the wasl app in Jumeirah Golf Estates.
  • Affection plan: The official plot plan from the authority.
  • VSR: Resolve flagged unapproved works first.

Documents you will need

  • Title deed and owner ID
  • Affection plan for the plot
  • Developer NOC (where the community has a developer)
  • Drawings and stamped structural calculations
  • Photos of the area

Who does what

Step by step

The order can vary by community and authority; we confirm it for your project.

StepApproval routeGuides
Ownership documents
You
Title deed and owner ID.—
Developer NOC
Nakheel or wasl
Approval of the extension.—
Drawings and calculations
Consultant
Prepared and stamped for Trakhees.Structural calculations
Submission
Consultant
To Trakhees CED.Trakhees approvals

Questions

Related questions

Do I need the Nakheel NOC first?

Yes, through the Nakheel online portal.

What if my VSR shows violations?

Resolve them first: survey, then approve or correct.

Do I need the affection plan?

Yes, for the drawings and the permit.

Who prepares the drawings?

The approved consultant.

What does Structural Solutions do?

We prepare and submit everything as approved consultant.

Related guides

Keep reading