Legal

Terms of Use and Disclaimer

Last updated October 2026 · Structural Solutions, Business Bay, Dubai

These terms apply to your use of structuralsolutions.ae. By using the website, you agree to them.

01General Information

The content on this website, including guides, articles, service descriptions and other written or visual material, is provided for general information only.

We work to keep this information accurate and up to date, but we make no representations or warranties, express or implied, about its completeness, accuracy or suitability for any particular purpose.

Nothing on this website is formal engineering advice, a legal opinion or a guarantee of any outcome. Always get project-specific advice from a qualified professional.

02No Engineering Advice

Our guides on topics such as wall removal, structural calculations, villa extensions and approvals are educational. They are not a substitute for a structural assessment or professional consultation for your property.

  • Every structure is different. Site conditions, soil, existing drawings and authority requirements vary from project to project.
  • Do not carry out any structural change, demolition or alteration based only on information from this website.
  • Structural Solutions accepts no responsibility for damage, injury or non-compliance arising from the misuse of general information on this website.

For any structural matter, contact us to arrange a proper assessment.

03Regulatory Information

We publish guidance on approval processes in the UAE, including Dubai Municipality (DM), Dubai Development Authority (DDA), Trakhees, Dubai Civil Defence (DCD), DEWA, RTA, DMCC and Concordia, and developers such as Emaar, Nakheel, DAMAC, Meraas, Dubai Holding and Meydan.

Authority requirements, NOC conditions, developer guidelines and procedures can change at any time without notice. Always confirm the current requirements with the relevant authority or developer, or with our team, before starting a project.

Structural Solutions is not liable for decisions made on the basis of requirements or procedures that have since changed.

04Scope of Services

Structural Solutions is a structural engineering and approvals consultancy based in Business Bay, Dubai. Our services include structural calculations, engineering and as-built drawings, shop drawings, developer NOC applications, authority approval submissions, inspections, sign-off and related consultancy.

  • Work is carried out project by project, under a signed agreement and an agreed scope of work.
  • Approval decisions are made by the relevant authority or developer and are never guaranteed by Structural Solutions.
  • Any project schedule shared during an engagement is an estimate and may change due to factors outside our control, such as authority workload, public holidays or missing documents.
  • Retrospective approvals and violation cases are handled case by case and depend on the authority's decision.

05Limitation of Liability

To the fullest extent permitted by UAE law, Structural Solutions and its engineers and staff are not liable for any direct, indirect, incidental, consequential or special loss arising from:

  • Reliance on information on this website without professional advice.
  • Changes to authority requirements or developer guidelines that affect a project.
  • Actions of third-party contractors, site conditions not disclosed to us, or events beyond our control.
  • Authority processing delays outside our control.
  • Decisions by an authority or developer to approve, reject or conditionally approve a submission.

Our total liability for any engagement is limited to the fees paid for that specific scope of work.

06Intellectual Property

All content on this website, including text, guides, diagrams, illustrations, images and branding, is the intellectual property of Structural Solutions unless stated otherwise.

  • Content may not be reproduced, republished or used commercially without our written permission.
  • You may share a link to an individual guide for personal, non-commercial use, with clear credit to the source.
  • Drawings, reports and technical documents we prepare for a client remain our property until full payment is received, after which usage rights pass to the client as agreed in the engagement terms.

07Third-Party Links

This website may link to external websites, including government and developer portals and service providers. These links are for convenience only. We do not control and are not responsible for their content, accuracy or availability.

08Privacy

How we collect and use personal information is explained in our Privacy Policy.

09Governing Law

These terms are governed by the laws of the United Arab Emirates and, where applicable, the Emirate of Dubai. Any dispute relating to this website or our services is subject to the exclusive jurisdiction of the courts of Dubai.

If any part of these terms is found unenforceable, it will be limited to the minimum extent necessary and the rest will remain in effect.

10Changes to These Terms

We may update these terms at any time. Changes take effect when published on this page with a new "last updated" date. Continued use of the website means you accept the updated terms.

Questions about these terms?

Our team is available Monday to Friday, 8:00 AM to 5:00 PM (closed Saturday and Sunday).