Casa Villa NOC in Arabian Ranches 2: What Can I Change?

A Casa villa NOC comes from Emaar. Structural works then need a DDA building permit, and we prepare the drawings and handle both.

Do I need a Casa villa NOC?

Yes. Casa is a villa cluster in Arabian Ranches 2, an Emaar community. Works need an Emaar NOC and, for structural changes, a DDA building permit. Emaar provides the as-built plans, and our engineers prepare the drawings and stamped calculations.

Developer NOCEmaar NOC
AuthorityDDA
PlansEmaar provides as-built plans

Emaar’s guide

Casa: what Emaar’s guide allows

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application, and we confirm whether your unit follows the villa or townhouse rules.

ItemVillaTownhouse
ExtensionDepends on your villa and plot; Emaar reviews each caseDepends on the unit; Emaar reviews each case
First floorAsk us: we advise on each villaNot allowed
Maid or driver roomSide alley, 3 m offset or as the affection plan allowsEnd and corner units only
GarageStays parking; approved side screens and folding doorsStays parking; no roll-up doors or extra parking
BalconyRear can be closed. Front cannotElevation and railings kept
Pool1.5 m from the boundary wall and the villa1.5 m from the boundary wall
Pergola1.2 m from the boundary, 20 m² or 15% of the plot0.6 m from the limits, 20 m² on standard plots
Emaar GFA rateAED 1,000 per sq ft up to 10%; AED 3,000 to AED 6,000 above, subject to Emaar Management approvalAED 1,000 per sq ft, subject to Emaar review
RouteEmaar NOC, then DDA permitEmaar NOC, then DDA permit

What we check before applying for a Casa villa NOC

  • Plot and setbacks: Where an extension or pergola can go on your plot.
  • Structure: Walls, slabs and foundations before any opening or new load.
  • As-built plans: Emaar provides them; we check them against the villa on site.
  • Unapproved works: Older changes are surveyed and approved before new works.

What to send us

  • Photos of the villa and the area you want to change
  • Plot or unit number
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Who does what

Casa Villa NOC: the approval route

We confirm the exact route for your property.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides.—
Emaar NOC
Emaar
NOC for the works, applied for online.—
Permit
DDA
Building permit for structural works such as extensions, mezzanines and void closures.—
Inspections
Emaar and DDA inspectors
Final inspections after the works; the order can vary.—
Completion
DDA
Completion certificate that closes the permit.—

How it works

How works go in Casa

Before you plan

Check the plot, setbacks and the as-built plans Emaar provides, so the design fits what Arabian Ranches 2 allows.

Approvals in the right order

The Emaar NOC comes first, then the DDA permit for structural works.

Built as approved

After the works, Emaar and DDA inspect them before the completion certificate.

What each work needs in Casa

  • Villa extension: Emaar NOC, DDA permit and stamped calculations
  • Swimming pool: Emaar NOC, DDA permit and the DM Environment Department pool NOC
  • Pergola or car shade: Emaar NOC; stamped calculations for the structure
  • Wall removal or opening: Structural check first, then Emaar NOC and DDA permit
  • Balcony closure: Emaar NOC, DDA permit and a structural check of the enclosure
  • Mezzanine floor: Structural design, Emaar NOC and DDA permit; it may add floor area
  • Double-height void closure: New slab design, Emaar NOC and DDA permit
  • Garage: stays parking; side screens and folding doors need the Emaar NOC
  • Maid room extension: Emaar NOC, DDA permit and stamped calculations
  • Staircase change or villa lift: Slab opening design, Emaar NOC and DDA permit
  • Solar panels: Emaar NOC, roof structure check and DEWA approval
  • Kitchen, bathroom or internal works: Emaar NOC and the developer inspection after the works
  • Sign-off: Emaar and DDA final inspections, owner letter and completion certificate

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Casa Villa NOC questions

How do I get a Casa villa NOC?

We prepare the drawings and apply to Emaar for you; structural works then need a DDA permit.

Can I extend my villa in Casa?

Often yes, if the design fits the plot and setbacks in Arabian Ranches 2. You need an Emaar NOC, then a DDA permit.

Do I need an Emaar NOC for works in Casa?

Yes. Casa is part of Arabian Ranches 2, so works need an Emaar NOC first.

Which authority issues the permit in Casa?

DDA issues the building permit for structural works in Casa.

Does Emaar provide the villa plans?

Yes, Emaar provides as-built plans, which we use for the drawings and calculations.