Fit-out sign-off · Dubai

Building Management Final Inspection in Dubai

Send us the approved drawings and photos of the finished fit-out. We will prepare the completion pack and handle the inspections.

After a fit-out or apartment renovation, building management inspects the works against the NOC drawings before releasing the completion and any deposit. Missing as-built drawings and changes from the approved design are the usual comments.

Building ManagementFinal inspection
DCD InspectionFire safety
CompletionFit-out closed

Works finished?

Request your completion certificate online. Tell us what was done, upload your documents, and we initiate the sign-off with the relevant developer and authority on your behalf.

Request sign-off online →

What the Inspectors Check

  • Building management: the landlord, building management or mall inspects the fit-out before completion
  • Built as approved: any change from the approved drawings must be approved or corrected before sign-off
  • Deposit: where the developer took a refundable deposit, it is returned after clearance
  • What Is Checked: Layout, services, fire safety and finishes in shared areas.
  • How We Help: As-built drawings, the completion pack and attendance at the inspection.

Documents you will need

  • Approved fit-out drawings and NOCs
  • Photos of the finished fit-out
  • Trade licence and tenancy contract
  • Contractor details
  • Any inspection comments received

How it works

How Fit-Out Sign-Off Works

01

Fit-Out Finished as Approved

02

As-Built Drawings and Owner Letter

03

Building Management Inspection

04

DCD Final Inspection

05

Authority Completion

06

Deposit Returned After Clearance

Who does what

Building Management Final Inspection in Dubai

📐

Structural Solutions

As-built drawings, structural check where needed, and the completion pack; we coordinate the inspections.

🏘️

Building management, landlord or mall

Final inspection of the fit-out against the approved drawings.

🧯

Dubai Civil Defence (DCD)

Final inspection of sprinklers, alarms, exits and other fire safety changes.

🏛️

Authority (DDA, DM, Trakhees or DMCC via Concordia)

Completion certificate for the fit-out.

🏘️

Building management or landlord

Fit-out deposit returned after clearance, where one was paid.

What Tenants Ask Us About Fit-Out Sign-Off

  • Office
  • Apartment
  • Shop
  • Services
  • Fire Safety
  • Deposit

What holds up sign-off

  • Works differ from the approved drawings
  • No as-built drawings
  • Owner letter missing
  • Inspection comments still open

Questions

Frequently asked questions

What does building management check?

The works against the approved NOC drawings.

What does fit-out sign-off mean?

The final inspections and the completion certificate for the fit-out.

Is DCD part of fit-out sign-off?

Yes, where fire safety systems were changed, which is the case in most fit-outs.

Is an owner letter needed?

Yes, an owner letter is required for completion.

When is the fit-out deposit returned?

Where one was paid, after clearance.