Commercial sign-off · Dubai

Restaurant Fit-Out Sign-Off in Dubai

Send us the approved drawings and photos of the finished fit-out. We will prepare the completion pack and handle the inspections.

A restaurant fit-out is signed off after the landlord or mall inspection, DCD approval and inspection, which every restaurant needs, and the DM Food Safety layout approval. Gas works must be done by a DCD-approved third party.

Building ManagementFinal inspection
DCD InspectionFire safety
CompletionFit-out closed

Works finished?

Request your completion certificate online. Tell us what was done, upload your documents, and we initiate the sign-off with the relevant developer and authority on your behalf.

Request sign-off online →

What the Inspectors Check

  • DM Food Safety: food outlets need the DM Food Safety layout approval, and any update needs re-approval
  • DCD final inspection: Dubai Civil Defence inspects sprinklers, alarms, exits and other fire safety changes
  • Building management: the landlord, building management or mall inspects the fit-out before completion
  • Owner letter: a signed owner letter is required for the completion certificate
  • Food Safety: The kitchen and food areas follow the DM Food Safety approved layout; any update needs re-approval.
  • Fire and Gas: DCD inspects fire safety and the gas works by a DCD-approved third party.

Documents you will need

  • Approved fit-out drawings and NOCs
  • Photos of the finished fit-out
  • Trade licence and tenancy contract
  • Contractor details
  • Any inspection comments received

How it works

How Fit-Out Sign-Off Works

01

Fit-Out Finished as Approved

02

As-Built Drawings and Owner Letter

03

Building Management Inspection

04

DCD Final Inspection

05

Authority Completion

06

Deposit Returned After Clearance

Who does what

Restaurant Fit-Out Sign-Off in Dubai

📐

Structural Solutions

As-built drawings and the completion pack; we coordinate the inspections.

🏘️

Landlord, developer or mall

Final inspection of the fit-out.

🏛️

DM Food Safety

Layout approval for the kitchen and food areas; any update needs re-approval.

🧯

Dubai Civil Defence (DCD)

DCD approval and final inspection, needed for every restaurant, including gas works by a DCD-approved third party.

🏛️

Authority

Completion certificate.

What Tenants Ask Us About Fit-Out Sign-Off

  • Kitchen
  • Dining Area
  • Terrace
  • Shisha Area
  • Gas
  • Exhaust

What holds up sign-off

  • Works differ from the approved drawings
  • No as-built drawings
  • Owner letter missing
  • Inspection comments still open

Questions

Frequently asked questions

What does restaurant sign-off need?

Landlord inspection, DCD, DM Food Safety and the completion.

What does fit-out sign-off mean?

The final inspections and the completion certificate for the fit-out.

Is DCD part of fit-out sign-off?

Yes, where fire safety systems were changed, which is the case in most fit-outs.

Is an owner letter needed?

Yes, an owner letter is required for completion.

When is the fit-out deposit returned?

Where one was paid, after clearance.