Warehouse Fit-Out Sign-Off in Dubai
Send us the approved drawings and photos of the works. We will check the structure and handle DCD, the authority inspection and the completion certificate.
A warehouse fit-out, such as offices, partitions, mezzanines or racking inside the shed, is signed off after DCD approval and inspection and the authority final inspection. As-built drawings and the owner letter are required for completion.
Works finished?
Request your completion certificate online. Tell us what was done, upload your documents, and we initiate the sign-off with the relevant developer and authority on your behalf.
Request sign-off online →What the Inspectors Check
- DCD: DCD approval and final inspection are needed for warehouse works
- Mezzanine: a mezzanine adds floor area and needs structural approval and inspection
- Racking: racking needs stamped structural calculations, including anchors and slab loads
- Owner letter: a signed owner letter is required for the completion certificate
- What Is Checked: Layout, fire safety, mezzanine and racking structure, and services.
- Our Role: Structural check, as-built drawings and the completion pack.
Documents you will need
- Approved permit drawings
- Photos of the finished works
- Trade licence and tenancy or title deed
- Racking or mezzanine details, if any
- Any inspection comments received
How it works
How Warehouse Sign-Off Works
01
Works Finished as Approved
02
As-Built Drawings and Owner Letter
03
Structural Check
04
DCD Final Inspection
05
Authority Final Inspection
06
Completion Certificate
Who does what
Warehouse Fit-Out Sign-Off in Dubai
Structural Solutions
As-built drawings, structural check of steel, mezzanine or racking, and the owner letter pack.
Dubai Civil Defence (DCD)
DCD approval and final inspection of the fire safety works.
Authority (DM, Trakhees or DDA by area)
Final inspection of the permitted works.
Authority
Completion certificate issued.
What Warehouse Owners Ask Us About
- Office Block
- Partitions
- Mezzanine
- Racking
- Fire Safety
- Services
What holds up sign-off
- Works differ from the approved drawings
- No as-built drawings
- Owner letter missing
- Inspection comments still open
Questions
Frequently asked questions
Does a warehouse fit-out need sign-off?
Yes, DCD and the authority inspect it.
Does a warehouse need DCD for sign-off?
Yes, DCD approval and inspection are needed for warehouse works.
Which authority signs off my warehouse?
It depends on the area: DM in Al Quoz and DIP, Trakhees in JAFZA, DDA in Dubai Industrial City.
Is an owner letter needed?
Yes, an owner letter is required for the completion certificate.
Do racking and mezzanines need sign-off?
Yes, they are structural and need approval and inspection.