A clear answer, and other options if the first idea does not work.
How Do I Know If My Renovation Idea Is Possible in Town Square?
Send us photos, your plot details and a sketch. We check it against the villa plans and Nshama rules and tell you what is realistic before you pay for full drawings.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
What We Check
Area, boundary distances, height, the look and the structure.
How It Works in Town Square
01
Your Idea, Photos and Plot Details
02
Villa Plans and Site Survey
03
Sketch and Early Check
04
Drawings and Structural Calculations
05
Nshama NOC (App or Email)
06
DDA Permit, Works and Completion
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
What You Get
What Town Square Owners Ask Us About
Extension
Pool
Roof Room
Pergola
Lift
Wall Removal
How Do I Know If My Renovation Idea Is Possible in Town Square
| Step | Who | What happens |
|---|---|---|
| 1 | You and our engineers | Your idea, photos and plot details. We check your villa plans against what is built, or survey the villa. |
| 2 | Nshama (app or email) | Reviews the design against its community rules and issues the NOC. |
| 3 | DDA | Building permit for structural works. |
| 4 | Nshama and DDA | Inspections and completion. |
What Nshama and DDA Look At Here
- Early answer: photos and a sketch let us tell you if the idea is realistic before full drawings
- Community rules: Nshama checks floor area, distance from boundaries, height and the look of the villa against its rules for your plot
- Villa plans: use the plans from your handover documents; if you do not have them, we survey the villa
What to Send Us
- Title deed and owner ID
- Photos of the villa and the area to change
- Villa plans from your handover documents (or we survey the villa)
- Your idea: a sketch is enough to start
- Drawings and structural calculations (we prepare these)
Nshama NOC
We apply for you
Villa Plans
From handover or our survey
DDA Permit
For structural works
Why Town Square Owners Work With Us
We Check Before You Spend
We tell you early if your idea is realistic for your villa, before full drawings.
Nshama and DDA Handled
We prepare the drawings, apply for the Nshama NOC and handle the DDA permit.
Engineers In-House
Extensions, openings, lifts, pools and shades designed and stamped by our own engineers.
Tell Us What You Want to Change
Send us photos, your plot details and your idea. We will tell you what is possible and handle the Nshama and DDA approvals.
How Do I Know If My Renovation Idea Is Possible in Town Square? FAQs
Can you tell me if my idea is possible in Town Square?
Yes, from photos and a sketch.
Who approves changes to my Town Square villa?
Nshama issues the NOC first, then DDA issues the building permit for structural works.
Do I need full drawings to ask if my idea is possible?
No. Photos and a simple sketch are enough for us to give you an early answer.
Can I get the plans of my villa?
Use the plans from your handover documents. If you do not have them, we survey the villa.
Can you handle everything for me?
Yes. We check the idea, prepare drawings and calculations, submit to Nshama and handle the DDA permit.
